

Click here to download a PDF listing of the below files. - 114 KB PDF
| ID | Description | Staff |
| 1 | 438 SYSTEM DEVELOPMENT PLAN | View |
| 2 | 8 HOUR FLASH LAUNCH REPORT, VEHICLE LV-2A BOOSTER NUMBER 395 AND SS-01A ORBITAL STAGE NUMBER 1604 | View |
| 3 | 8 HOUR FLASH REPORT DISCOVERER 40/THOR BOOSTER NUMBER 333 AND AGENA B ORBITAL STAGE NUMBER 1125 | View |
| 4 | 8 HOUR FLASH REPORT, SLV-2 BOOSTER NUMBER 368 AND S-01A ORBITAL STAGE NUMBER 1156 | View |
| 5 | 8 HOUR FLASH REPORT, SLV-2 BOOSTER NUMBER 369 AND S-01A ORBITAL STAGE NUMBER 1157 | View |
| 6 | 8 HOUR FLASH REPORT, SLV-2 BOOSTER NUMBER 369 AND S-01A ORBITAL STAGE NUMBER 1157 | View |
| 7 | 8 HOUR FLASH REPORT, VEHICLE LV-2A BOOSTER NUMBER 396 AND SS-01A ORBITAL STAGE NUMBER 1175 | View |
| 8 | 8 HOUR FLASH REPORT, VEHICLE SLV-2/SS-01A/406/1172 | View |
| 9 | 8 HOUR LAUNCH FLASH REPORT DISCOVERER 42/THOR 336/AGENA B 1128 | View |
| 10 | 8 HOUR LAUNCH FLASH REPORT, DISCOVERER 41/THOR 334 AND AGENA B 1126 | View |
| 11 | 8 HOUR LAUNCH FLASH REPORT, DISCOVERER 43/THOR 335 AND AGENA B 1127 | View |
| 12 | 8 HOUR LAUNCH FLASH REPORT, LV-2A BOOSTER NUMBER 386 AND SS-01A ORBITAL STAGE NUMBER 1601 | View |
| 13 |
8 HOUR LAUNCH FLASH REPORT, PROGRAM 162, THOR BOOSTER NUMBER
349 AND AGENA D ORBITAL STAGE NUMBER 1153 |
View |
| 14 | 8 HOUR LAUNCH FLASH REPORT, PROGRAM 622A, DISCOVERER 44/THOR 339 AND AGENA B 1129 | View |
| 15 |
8 HOUR LAUNCH FLASH REPORT, PROGRAM 622A, THOR BOOSTER
NUMBER 342 AND AGENA B ORBITAL STAGE NUMBER 1130 |
View |
| 16 |
8 HOUR LAUNCH FLASH REPORT, PROGRAM 622A, THOR BOOSTER
NUMBER 344 AND AGENA D ORBITAL STAGE NUMBER 1152 |
View |
| 17 |
8 HOUR LAUNCH FLASH REPORT, PROGRAM 622A, THOR BOOSTER
NUMBER 347 AND AGENA B ORBITAL STAGE NUMBER 1131 |
View |
| 18 | 8 HOUR LAUNCH FLASH REPORT, SLV-2 BOOSTER NUMBER 353 AND S-01A ORBITAL STAGE NUMBER 1401 | View |
| 19 | 8 HOUR LAUNCH FLASH REPORT, SLV-2 BOOSTER NUMBER 356 AND S-01 ORBITAL STAGE NUMBER 1136 | View |
| 20 | 8 HOUR LAUNCH FLASH REPORT, SLV-2 BOOSTER NUMBER 371 AND S-01A ORBITAL STAGE NUMBER 1411 | View |
| 21 | 8 HOUR LAUNCH FLASH REPORT, SLV-2 BOOSTER NUMBER 376 AND S-01A ORBITAL STAGE NUMBER 1160 | View |
| 22 | 8 HOUR LAUNCH FLASH REPORT, SLV-2 BOOSTER NUMBER 381 AND S-01A ORBITAL STAGE NUMBER 1166 | View |
| 23 | 8 HOUR LAUNCH FLASH REPORT, SLV-2 BOOSTER NUMBER 382 AND S-01A ORBITAL STAGE NUMBER 1167 | View |
| 24 | 8 HOUR LAUNCH FLASH REPORT, SLV-2 BOOSTER NUMBER 388 AND S-01A ORBITAL STAGE NUMBER 1412 | View |
| 25 | 8 HOUR LAUNCH FLASH REPORT, SLV-2 BOOSTER NUMBER 394 AND S-01A ORBITAL STAGE NUMBER 1169 | View |
| 26 | 8 HOUR LAUNCH FLASH REPORT, SLV-2 BOOSTER SERIAL NUMBER 360 AND S-01A ORBITAL STAGE NUMBER 1164 | View |
| 27 | 8 HOUR LAUNCH FLASH REPORT, SLV-2, BOOSTER 367, NUMBER 1135 | View |
| 28 | 8 HOUR LAUNCH FLASH REPORT, SLV-2, NUMBER 1171 | View |
| 29 | 8 HOUR LAUNCH FLASH REPORT, SLV-2A BOOSTER NUMBER 337 AND S-01A ORBITAL STAGE NUMBER 1162 | View |
| 30 | 8 HOUR LAUNCH FLASH REPORT, SLV-2A BOOSTER NUMBER 364 AND S-01A ORBITAL STAGE NUMBER 1165 | View |
| 31 | 8 HOUR LAUNCH FLASH REPORT, SLV-2A, NUMBER 1159 | View |
| 32 | 8 HOUR LAUNCH FLASH REPORT, SLV-2A, NUMBER 1161 | View |
| 33 | 8 HOUR LAUNCH FLASH REPORT, SLV-2A, NUMBER 1163 | View |
| 34 | 8 HOUR LAUNCH FLASH REPORT, THOR BOOSTER NUMBER 350 AND AGENA B ORBITAL STAGE NUMBER 1133 | View |
| 35 | 8 HOUR LAUNCH FLASH REPORT, THOR BOOSTER NUMBER 351 AND AGENA D ORBITAL STAGE NUMBER 1154 | View |
| 36 | 8 HOUR LAUNCH FLASH REPORT, THOR BOOSTER NUMBER 352 AND AGENA B ORBITAL STAGE NUMBER 1134 | View |
| 37 | 8 HOUR LAUNCH REPORT, PROGRAM 162, THOR BOOSTER NUMBER 348 AND AGENA B ORBITAL STAGE NUMBER 1132 | View |
| 38 | 8 HOUR LAUNCH REPORT, SLV-2, BOOSTER 361, NUMBER 1155 | View |
| 39 | AC SPARK PLUG DIVISION OF GENERAL MOTORS EFFORTS | View |
| 40 | ACTION REQUESTED OF AFBMD FOR GENERAL SCHRIEVER | View |
| 41 | ADDENDUM TO GOVERNMENT REQUIREMENT FOR RECONNAISSANCE SATELLITE WEAPON SYSTEM | View |
| 42 | ADDITION OF DISCUSSIONS ON GEOPHYSICAL PROBLEMS TO TECHNICAL DIRECTIVE (TD) MEETINGS | View |
| 43 | ADDITIONAL ATLAS/AGENA LAUNCH FACILITY, MEMO FOR THE SECRETARY OF THE AIR FORCE | View |
| 44 | ADDITIONAL FY 1958 FUNDS FOR WS-315A AND WS-117L | View |
| 45 | AERIAL PHOTOGRAPHIC RECONNAISSANCE - INTRODUCTION | View |
| 46 | AF BALLISTIC MISSILE COMMITTEE | View |
| 47 | AF BMD ACTIVITIES IN SPACE OCTOBER-NOVEMBER 1959 | View |
| 48 | AF BMD ADVANCED RECONNAISSANCE SYSTEM (WS-117L) PART B | View |
| 49 | AF BMD AIR RESEARCH AND DEVELOPMENT COMMAND OPERATIONS ORDER SERIAL NUMBER 2-58 | View |
| 50 | AF BMD AIR RESEARCH AND DEVELOPMENT COMMAND OPERATIONS ORDER SERIAL NUMBER 3-58 | View |
| 51 | AF BMD HAS VALID REQUIREMENT FOR PERMANENT USE OF A MAJOR PORTION OF MOFFETT NAVAL AIR STATION | View |
| 52 | AF SPACE ACTIVITIES CHRONOLOGY | View |
| 53 | AF SPACE MISSION REQUIREMENTS - BRIEFING ON LAUNCH VEHICLES AND BOOSTERS | View |
| 54 | AF SPACE SYSTEMS DEVELOPMENT PROGRAM | View |
| 55 | AF SUPPORT OF THE NATIONAL SPACE PROGRAM AND HANDWRITTEN NOTES | View |
| 56 | AF SYSTEMS COMMAND DEVELOPMENT PLAN FOR HYBALINE-FUELED AGENA SPACE VEHICLE SYSTEM N. SS-01-B | View |
| 57 | AFBMD APPROVED REVISED SAMOS DEVELOPMENT PLAN DATED 11 AUG 60 | View |
| 58 | AFCCM FUNCTIONS AND PROPOSED FUNCTIONS OF CCM TO BE TRANSFERRED TO DCS/DEVELOPMENT | View |
| 59 | AIR FORCE IN SPACE FISCAL YEAR 1962 PART B | View |
| 60 | AIR STAFF AND MAJOR COMMANDS NOTIFIED OF NEW ORGANIZATION BY AFCSS LTR DATED 14 OCT 60 | View |
| 61 | AIR UNIVERSITY STUDY RESEARCH AND DEVELOPMENT IN THE UNITED STATES AIR FORCE | View |
| 62 | ANALYSIS OF COMPLEX 65-1 AT COOKE AIR FORCE BASE | View |
| 63 | APPLICATION OF HIGH PERFORMANCE SOLID ROCKETS | View |
| 64 |
ARDC (AIR FORCE RESEARCH AND DEVELOPMENT COMMAND) CONFERENCE
21 SEPTEMBER AND MEETING OF GUIDED MISSILE AND SPACE VEHICLE ON 20 SEPTEMBER |
View |
| 65 | ARDC SLED TRACK REQUIREMENTS AND RELATED REQUIREMENT FOR RELOCATING EXISTING LAUNCH STANDS | View |
| 66 | ARDC SPECIAL ORDERS - NUMBER M-1146 | View |
| 67 | ARDC SYSTEM DEVELOPMENT DIRECTIVE ADVANCED RECONNAISSANCE SYSTEM | View |
| 68 | ARDC SYSTEM DEVELOPMENT DIRECTIVE ADVANCED RECONNAISSANCE SYSTEM, SDD NO. 117L | View |
| 69 | ARDC SYSTEM REQUIREMENT | View |
| 70 | ARGON - CONTROL OF THE ARGON PROGRAM | View |
| 71 | ARGON PROGRAM TO BE HANDLED WITHIN THE SAMOS MANAGEMENT STRUCTURE | View |
| 72 | ARGON RECENT INFORMATION ABOUT ARGON PROJECT | View |
| 73 | ARMED FORCES POLICY COUNCIL, ADVICE OF ACTION ON PACIFIC MISSILE RANGE | View |
| 74 | ARMY SATELLITE AND SPACE REQUIREMENTS | View |
| 75 | ARMY SCIENTIFIC SATELLITE PROGRESS REPORT 1 | View |
| 76 | ARPA (ADVANCED RESEARCH PROJECTS AGENCY) BRIEFING | View |
| 77 | ARPA (ADVANCED RESEARCH PROJECTS AGENCY) ORDER NUMBER 2-58 | View |
| 78 | ARPA (ADVANCED RESEARCH PROJECTS AGENCY), FY 1957 WS117L FUNDING | View |
| 79 | ARPA (ADVANCED WEAPON SYSTEM STUDY) PART III - ADVANCED MILITARY SATELLITES VOLUME II PART B | View |
| 80 | ARPA (ADVANCED WEAPON SYSTEMS STUDY) PART III - ADVANCED MILITARY SATELLITES VOLUME I SUMMARY | View |
| 81 | ARPA (ADVANCED WEAPONS SYSTEMS) STUDY PART III ADVANCED MILITARY SATELLITES VOLUME III PART B | View |
| 82 |
ARPA FY60 BUDGET: ANNUAL AMOUNT SHOULD BE USED AS GUIDANCE
IN SCHEDULING WORK, CLN/1/SENTRY $135,000,000 |
View |
| 83 | ARPA ORDER 9-58 FUNDS FOR WS 117L | View |
| 84 |
ARPA ORDER NO. 119-60 TRANSFER OF RESPONSIBILITY FOR THE
SAMOS-MIDAS-DISCOVERER PROGRAM TO DEPARTMENT OF THE AIR FORCE |
View |
| 85 | ARPA ORDER NO. 4860 AMENDMENT 7 TO FURTHER INCREASE FUNDING AVAILABILITY | View |
| 86 |
ARPA ORDER NO. 9 DATED JUNE 30 1958, AS AMENDED TO INCREASE
THE FUND AVAILABILITY BY $200,000,000 FROM $147,600,000 |
View |
| 87 | ARPA ORDER NO. 9-60, AMENDMENT, TO INCREASE THE FUND AVAILABILITY | View |
| 88 | ARPA ORDER NUMBER 41-59 CONSTRUCTION OF A GUIDED MISSILE ASSEMBLY BUILDING | View |
| 89 | ARPA ORDER NUMBER 41-59 DECREASE THE FUND AVAILABILITY | View |
| 90 | ARPA TRANSFER OF RESPONSIBILITY, PROGRESS AND STATUS | View |
| 91 | ARS (ADVANCED RECONNAISSANCE SYSTEM) EVOLUTION | View |
| 92 | ARS ACTIVITIES, MEMO FOR COL TERHUNE | View |
| 93 | ARS COMPONENT RELIABILITY STUDY FINAL REPORT | View |
| 94 | ARS COMPONENT RELIABILITY STUDY PART B | View |
| 95 | ARS EVALUATION BOARD, MEMO FOR THE RECORD | View |
| 96 | ARS FUNDING (WS 117L, DISCOVERER/SENTRY) | View |
| 97 | ARS PRELIMINARY DEVELOPMENT PLAN | View |
| 98 | ARS PROGRAM, 55 1005 | View |
| 99 | ARS PROGRESS REPORT | View |
| 100 |
ARS TRACKING, TELEMETRY, COMMANDS, POWER AND PYROTECHNIC
INTERFACE SPECIFICATION FOR ARS PAYLOAD AND PROGRAM 241 AGENA ORBITAL VEHICLE |
View |
| 101 | ARS WEAPON SYSTEM 117L | View |
| 102 | ARS WEAPON SYSTEM 117L, SUMMARY OF THE DEVELOPMENT CONCEPTS AND PRESENT STATUS | View |
| 103 | ARTICLE: SPACE ESPIONAGE PLANS FOR AND INTERNATIONAL LAW | View |
| 104 | ARTICLES CONCERNING MILITARY USES OF SPACE FLIGHT | View |
| 105 | ASSESSMENT OF PRESENT STATUS OF BALLISTIC MISSILE PROGRAMS BY DIRECT COMPARISON WITH SCHEDULES | View |
| 106 | ASSIGNMENT OF GEN CURTIN AS DIR OFFICE OF MISSILE & SATELLITE SYSTEMS | View |
| 107 | ASSIGNMENT OF OPERATIONAL PLANNING RESPONSIBILITY | View |
| 108 | ASTRONAUTICS PROGRAM | View |
| 109 | AVAILABILITY OF SM 65A MISSILES FOR WS 117L | View |
| 110 | BALLISTIC MISSILES AND THE REACH INTO SPACE | View |
| 111 | BASIC GUIDANCE PROVIDES A SOUND BASIS FOR REVISED DEVELOPMENT & IOC PLAN | View |
| 112 | BIOASTRONAUTICS - DISCOVERER BOARD REPORT, APPENDIX A | View |
| 113 | CHRONOLOGY OF SENTRY AND SAMOS PROGRAMS 2 MARCH 1959 TO DECEMBER 1960 | View |
| 114 | COMMENTS ON "RESEARCH AND DEVELOPMENT OF GUIDED MISSILES AND SPACE VEHICLES 1955-1975" | View |
| 115 | COMMENTS ON R.C. HALL'S, "THE AGENA SATELLITE" | View |
| 116 | COMMUNICATIONS-ELECTRONICS ACTIVITIES CLASSIFIED CED EXTRACTS DEPARTMENT OF THE AIR FORCE | View |
| 117 | COMPARISON OF BMD (BALLISTIC MISSILE DEVELOPMENT) PROGRAMS | View |
| 118 |
CONCERN OVER THE RATE OF PROGRESS IN THE WS 117L FLIGHT TEST
PROGRAM AND CAPABILITIES TO MEET CURRENTLY |
View |
| 119 | CONCURRENCE WITH WDD SELECTION OF LOCKHEED AS WEAPON SYSTEM CONTRACTOR FOR WS 117L | View |
| 120 | CONSERVING THE AIR FORCE BALLISTIC MISSILE DIVISION SPACE MISSION | View |
| 121 | CONSIDERATION OF THE ACHIEVEMENT OF AN EARLIEST LAUNCH CAPABILITY FROM THE 65-1 COMPLEX | View |
| 122 | CONTRACT AF 04 (647)-97, POINT OF ACCEPTANCE | View |
| 123 | CONTRACT NUMBER AF 04 (647) - 181 BIOSATELLITE FLIGHT PROGRAM PLAN | View |
| 124 | CONVAIR - LOCKHEED RELATIONSHIP - 117L AND 438L - NOTE FROM GENERAL SCHRIEVER TO COLONEL TERHUNE | View |
| 125 | COORDINATION OF SATELLITE AND SPACE OPERATIONS | View |
| 126 | CORONA - DISTRIBUTION OF RESPONSIBILITIES FOR CORONA - MEMO FOR MAJ GEN JACOB E. SMART | View |
| 127 | CORONA DOS DRAFT ON DISCOVERER INFO AND CONTINGENCY PLAN | View |
| 128 |
CORONA - LETTER TO VANCE RE AGENCY'S ROLE IN CORONA:
CONSOLIDATION OF CORONA PROGRAM UNDER OVERALL MANAGEMENT |
View |
| 129 |
CORONA - SPACE AND MISSILE SYSTEMS CENTER LAAFB ORAL HISTORY
PROGRAM, INTERVIEW WITH LC MITCHELL, CORONA PROGRAM |
View |
| 130 | CORONA CO AIR RESEARCH & DEVELOPMENT COMMAND TO BISSELL | View |
| 131 | CORONA COMMANDER ARDC RE PROJECT CORONA | View |
| 132 | CORONA COVER PLAN | View |
| 133 | CORONA DISCOVERER DISCOVERER I SYSTEM TEST EVALUATION REPORT | View |
| 134 | CORONA LAUNCH OF DISCOVERER-3 (CORONA) ON 3 JUNE 1959 | View |
| 135 | CORONA MEMO FOR BG GOODPASTER ON PROJECT CORONA | View |
| 136 | CORONA MEMO FOR GEN GOODPASTER ON PROJECT CORONA, WS-117L | View |
| 137 | CORONA MISSION 9021 OPERATIONAL BRIEFING | View |
| 138 | CORONA MISSION REQUIREMENTS FOR CORONA MISSION 9032 | View |
| 139 | CORONA POST FLIGHT DATA REQUIREMENTS | View |
| 140 | CORONA PROJECT CORONA, DISCOVERY/SENTRYTO THE SATELLITE RECONNAISSANCE PROGRAM - MEMORANDUM FOR DR. EDWIN LAND | View |
| 141 | CORONA PROPOSED CURTAILMENT OF PROJECT CORONA | View |
| 142 |
CORONA REPORT - CORONA CR MISSION SUMMARY AND TELEMETRY
ANALYSIS MISSION 1114 AGENA 1660/PAYLOAD CR- 14, MAY 1971 |
View |
| 143 | CORONA SECURITY IN 1960, DISCOVERY SERIES | View |
| 144 | DENVER DATA PROCESSING LABORATORY, SUGGESTED CATEGORIES FOR DISCUSSION ADHOC COMMITTEE | View |
| 145 | DEVELOPMENT OF SPACE SYSTEMS SAFS FILE 29-61 | View |
| 146 | DEVELOPMENT OF SPACE SYSTEMS, MEMO FOR SECRETARY OF THE ARMY, NAVY AND AIR FORCE | View |
| 147 | DIARY ITEMS FOR WEEK ENDING 16 MARCH 1956 | View |
| 148 | DIARY ITEMS FOR WEEK ENDING 20 JANUARY 1956 | View |
| 149 | DIARY ITEMS FOR WEEK ENDING 20 JANUARY 1956 | View |
| 150 | DIARY ITEMS FOR WEEK ENDING 27 JANUARY 1956 | View |
| 151 | DIARY ITEMS FOR WEEK ENDING 9 MARCH 1956 | View |
| 152 | DIRECTOR OF SPECIAL PROJECTS, SECRETARY OF THE AIR FORCE ORDER NO. 116.1 | View |
| 153 | DISCOVERER - DETAILS OF DISCOVERER III LAUNCH | View |
| 154 | DISCOVERER - COMMITTEE TO REVIEW DISCOVERER PROGRAM | View |
| 155 | DISCOVERER - COMPILED DATA REPORT ON DISCOVERER COVER PAYLOADS | View |
| 156 | DISCOVERER DATA ON DISCOVERER AND VARIOUS OTHER LAUNCH DATA FROM 1960 TO 1969 | View |
| 157 | DISCOVERER - DATA SHEETS: DISCOVERER PROGRAM PERFORMANCE | View |
| 158 | DISCOVERER - PRIMARY AND SECONDARY COVER STORIES FOR THE DISCOVERER (SATELLITE) PROGRAM | View |
| 159 | DISCOVERER SPEECH GIVEN BY GEN SHRIEVER RE: PROJECTS DISCOVERER AND SENTRY | View |
| 160 |
DISCOVERER 24 PRELIMINARY LAUNCH SUMMARY, 48 HOUR SUMMARY
REPORT ON THE LAUNCHING OF DISCOVERER XXIV (THOR 302/AGENA B 1108) |
View |
| 161 |
DISCOVERER 25 PRELIMINARY LAUNCH SUMMARY, 48 HOUR SUMMARY
REPORT ON THE LAUNCHING OF DISCOVERER 25 (THOR 303/AGENA B 1107) |
View |
| 162 |
DISCOVERER 26 PRELIMINARY LAUNCH SUMMARY, 48 HOUR SUMMARY
REPORT ON THE LAUNCHING OF DISCOVERER XXVI (THOR 308/AGENA B 1109) |
View |
| 163 |
DISCOVERER 27 PRELIMINARY LAUNCH SUMMARY, 48 HOUR SUMMARY
REPORT ON THE LAUNCHING OF DISCOVERER XXXI (THOR 322/AGENA B 1110) |
View |
| 164 | DISCOVERER BACKGROUND | View |
| 165 | DISCOVERER FINAL COMMENTS ON DISCOVERER I | View |
| 166 | DISCOVERER FUNDS | View |
| 167 | DISCOVERER I SYSTEM TEST EVALUATION REPORT | View |
| 168 | DISCOVERER INFO ON DISCOVERER VIII, DISCOVERER VEHICLES REVIEW OF PROGRESS | View |
| 169 | DISCOVERER IV LAUNCH CANCELLATION, PERSONAL FROM GENERAL WADE TO GENERAL RITLAND | View |
| 170 | DISCOVERER IX LAUNCHING | View |
| 171 | DISCOVERER LAUNCH REPORT 110/322, DISCOVERER XXVII | View |
| 172 | DISCOVERER MEMO FOR MR. PLUMMER - DISCOVERER XIV | View |
| 173 | DISCOVERER MONTHLY PROGRAM PROGRESS REPORT | View |
| 174 | DISCOVERER NAVY PROPOSAL FOR A PHOTO PAYLOAD FOR DISCOVERER PROGRAM | View |
| 175 | DISCOVERER PRELIMINARY LAUNCH SUMMARY, 48 HOUR SUMMARY REPORT ON THE LAUNCHING OF DISCOVERER XVIII | View |
| 176 | DISCOVERER PROGRAM OBJECTIVES AND FUNDING | View |
| 177 | DISCOVERER PROGRAM OBJECTIVES AND FUNDING | View |
| 178 | DISCOVERER PROJECT DISCOVERY TO ASSISTANT VICE CHIEF OF STAFF HEADQUARTERS USAF | View |
| 179 | DISCOVERER PURPOSE, DESIGN, DEVELOPMENT AND FLIGHT TEST OF DISCOVERER PROGRAM | View |
| 180 |
DISCOVERER QUERIES AS TO THE FEASIBILITY OF INCORPORATING
FILM PACKS OR EMULSION BLOCKS IN THE DISCOVERER SERIES SHOTS |
View |
| 181 | DISCOVERER RADAR TRACKING OF DISCOVERER PARTS | View |
| 182 | DISCOVERER RECOVERY OPERATIONS | View |
| 183 | DISCOVERER RE-ENTRY STUDIES | View |
| 184 | DISCOVERER REPORT - DISCOVERER CONTINGENCY PLAN PRESS RELEASE ACTION | View |
| 185 | DISCOVERER REQUEST AF DETERMINE RQMTS FOR RECOVERY VESSELS IN DISCOVERER PROGRAM | View |
| 186 | DISCOVERER RESEARCH PROGRAM | View |
| 187 | DISCOVERER RESEARCH SUBSATELLITE (HANDWRITTEN CHARTS) | View |
| 188 | DISCOVERER SHIP SUPPORT FOR DISCOVERER PROGRAM | View |
| 189 | DISCOVERER SPACE SYSTEM DEVELOPMENT PLAN | View |
| 190 | DISCOVERER SPACE SYSTEM DEVELOPMENT PLAN DISCOVERER PROGRAM | View |
| 191 |
DISCOVERER SPECIAL ORDERS NUMBER 695, STUDY OF EVENTS
INVOLVED IN LAUNCH AND RECOVERY OPERATIONS OF DISCOVERER XV |
View |
| 192 | DISCOVERER SPECIAL STAFF NOTE ON MISSILE LAUNCHINGS, DISCOVERER VII | View |
| 193 | DISCOVERER SUGGESTIONS FOR BETTER SUPPORT OF BALLISTIC MISSILE DEFENSE (MBD) DISCOVERER PROGRAM | View |
| 194 | DISCOVERER SUMMARY, PROGRAM MANAGEMENT, DEVELOPMENT, LAUNCHING AND TRACKING | View |
| 195 | DISCOVERER SYSTEM TEST DIRECTIVE PART A | View |
| 196 | DISCOVERER SYSTEM TEST DIRECTIVE PART B | View |
| 197 | DISCOVERER SYSTEM TEST DIRECTIVE PART C | View |
| 198 | DISCOVERER THE DISCOVERER PROGRAM BY COL. C.L. BATTLE, USAF AIR FORCE SPACE SYSTEMS DIVISION | View |
| 199 | DISCOVERER THE SIGNIFICANCE OF THE DISCOVERER PROGRAM | View |
| 200 | DISCOVERER X REPORT BY MISSILE MISHAP INVESTIGATING COMMITTEE | View |
| 201 |
DISCOVERER XIII (AGENA 1057/THOR231) SYSTEM TEST EVALUATION
AND PERFORMANCE ANALYSIS REPORT (35 DAY REPORT) PART B |
View |
| 202 | DISCOVERER XIII LIFE CYCLE | View |
| 203 |
DISCOVERER XIV (AGENA 1056/THOR2 237) SYSTEM TEST EVALUATION
AND PERFORMANCE ANALYSIS REPORT (35-DAY REPORT) PART B |
View |
| 204 | DISCOVERER XVII LETTER TO JAMES DOUGLAS RE MAIL LAUNCHED AND RETRIEVED ON DISCOVERER XVII | View |
| 205 | DISCOVERER XVlll LAUNCH | View |
| 206 |
DISCOVERER XXVII (THOR 322/AGENA 1110) SYSTEM TEST
EVALUATION AND PERFORMANCE ANALYSIS REPORT (35-DAY REPORT) |
View |
| 207 | DISCOVERER, SAMOS, AND MIDAS PROGRAM APPROVAL | View |
| 208 | DISCOVERER, SENTRY AND MIDAS REQUEST FY 59 AND 60 COST ESTIMATES, PURPOSE AND LOCATION OF FACILITIES | View |
| 209 | DISCOVERER, SENTRY, MIDAS SATELLITE DEVELOPMENT PROGRAMS | View |
| 210 | DISCOVERER/SENTRY PROGRAM FUNDING FEB 59 | View |
| 211 | DISCOVERER/SENTRY PROGRAM FUNDING MAY 59 | View |
| 212 | DISCOVERER-CORONA GENERAL BRIEFING PORTFOLIO PART B | View |
| 213 | DISCOVERER-THOR PROJECT AND SENTRY PROGRAMS MEMO FOR THE UNDER SECRETARY OF THE AIR FORCE | View |
| 214 | DOD 5160.32 DEVELOPMENT OF SPACE SYSTEMS, DEPARTMENT OF DEFENSE DIRECTIVE | View |
| 215 | DOD 5160.34, RECONNAISSANCE MAPPING AND GEODETIC PROGRAMS | View |
| 216 | EASTMAN KODAK HIGH ACUITY CAMERA PROJECT | View |
| 217 | EIGHTH INTERNATIONAL ASTRONAUTICAL CONGRESS | View |
| 218 | ELINT STUDY, MEMO FOR THE UNDER SECRETARY OF THE AIR FORCE | View |
| 219 | ESTABLISHMENT OF SYSTEM TEST WORKING GROUP | View |
| 220 | FINAL ADVANCED RESEARCH PROJECTS AGENCY (ARPA) SATELLITE PROGRESS REPORT | View |
| 221 | FINAL REPORT OF THE SECRETARY OF THE AIR FORCE MANAGEMENT STUDY COMMITTEE | View |
| 222 | FLASH REPORT OF LAUNCHING OF DISCOVERER X | View |
| 223 | FLASH REPORT OF LAUNCHING OF DISCOVERER XIV | View |
| 224 | FLASH REPORT OF LAUNCHING OF DISCOVERER XV | View |
| 225 | FLASH REPORT OF LAUNCHING OF DISCOVERER XVIII | View |
| 226 | FLASH REPORT ON LAUNCH OF DISCOVERER XXXIX/THOR 331/AGENA 1124 | View |
| 227 | FLASH REPORT ON LAUNCHING OF DISCOVERER NUMBER VIII | View |
| 228 | FLASH REPORT ON LAUNCHING OF DISCOVERER XIX | View |
| 229 | FLASH REPORT ON LAUNCHING OF DISCOVERER XVI | View |
| 230 | FLASH REPORT ON LAUNCHING OF DISCOVERER XVII | View |
| 231 | FLASH REPORT ON LAUNCHING OF DISCOVERER XXIII (THOR 307/AGENA 1106) | View |
| 232 | FLASH REPORT ON LAUNCHING OF DISCOVERER XXIX (THOR 323/AGENA B 1112) | View |
| 233 | FLASH REPORT ON LAUNCHING OF DISCOVERER XXVIII (THOR 309/AGENA B 1111) | View |
| 234 | FLASH REPORT ON LAUNCHING OF DISCOVERER XXX (THOR 310/AGENA B 111) | View |
| 235 | FLASH REPORT ON LAUNCHING OF DISCOVERER XXXI | View |
| 236 | FLASH REPORT ON THE LAUNCH OF DISCOVERER XXXVIII/THOR 241/AGENA B 1123 | View |
| 237 | FLASH REPORT ON THE LAUNCHING OF DISCOVERER XXXII (THOR 38/AGENA B 1115) | View |
| 238 |
FLASH REPORT ON THE LAUNCHING OF DISCOVERER XXXIII (THOR
329/AGENA B 116) AND CORRECTION TO FLASH REPORT DATED 10/25/61 |
View |
| 239 | FLASH REPORT ON THE LAUNCHING OF DISCOVERER XXXIV/THOR 330/AGENA B 1117 | View |
| 240 | FLASH REPORT ON THE LAUNCHING OF DISCOVERER XXXV/THOR 326/AGENA B 1118 | View |
| 241 | FLASH REPORT ON THE LAUNCHING OF DISCOVERER XXXVI/THOR 325/AGENA B 1119 | View |
| 242 | FLASH REPORT ON THE LAUNCHING OF DISCOVERER XXXVII/THOR 327/AGENA B 1120 | View |
| 243 | FLIGHT NUMBERS, PAYLOAD LISTINGS, AND DATES FOR THE DISCOVERER PROGRAM | View |
| 244 | FOLLOW-ON REPORT TO FLASH REPORT OF LAUNCHING OF DISCOVERER XI | View |
| 245 | FOLLOW-ON REPORT TO FLASH REPORT OF LAUNCHING OF DISCOVERER XII | View |
| 246 | FOLLOW-ON REPORT TO FLASH REPORT OF LAUNCHING OF DISCOVERER XIV | View |
| 247 | FOLLOW-ON REPORT TO FLASH REPORT OF LAUNCHING OF DISCOVERER XV | View |
| 248 | FOLLOW-ON REPORT TO FLASH REPORT WDGEV-11-13-C LAUNCH OF DISCOVERER | View |
| 249 | FOLLOW-ON REPORT TO FLASH REPORT WDGEVO-6-2-6, LAUNCH OF DISCOVERER IX | View |
| 250 | FUND STATUS REPORT CONTRACT AF 04 (645) | View |
| 251 | FUNDAMENTALS OF AERIAL RECOVERY | View |
| 252 | FUNDING OF CONTRACT INITIATION BOARD | View |
| 253 | FY59 117L PROGRAM | View |
| 254 | FY59 117L PROGRAM, MACINTYRE | View |
| 255 | FY59 AND FY60 PROGRAMMING FOR WS-117L | View |
| 256 | FY60 BUDGET DETERMINATIONS INDICATE AMOUNTS TO BE USED AS GUIDANCE IN SCHEDULING WORK | View |
| 257 | GEN CURTIN ASSIGNED DIRECTOR OFFICE OF SPACE AND SATELLITE SYSTEMS | View |
| 258 | GEN ROBERT GREER ASSIGNED DIRECTOR OF THE SAMOS PROJECT, SECRETARY OF THE AIR FORCE ORDER NO: 116.1 | View |
| 259 | GENERAL CONCLUSIONS IN THE FIELD OF SATELLITES AND SPACE FLIGHT | View |
| 260 | GENERAL OPERATIONAL REQUIREMENT FOR A RECONNAISSANCE SATELLITE WEAPON SYSTEM 1955 | View |
| 261 | GENERAL OPERATIONAL REQUIREMENT FOR A STRATEGIC RECONNAISSANCE SATELLITE WEAPON SYSTEM | View |
| 262 | GENERAL OPERATIONS REQUIREMENT (GOR) NUMBER 80 1959 | View |
| 263 | GEOPHYSICAL INFORMATION | View |
| 264 |
GOR-80-4 ADDENDUM: RECONNAISSANCE SATELLITE WEAPON SYSTEM,
LIST OPERATIONAL PERFORMANCE OF MAPPING AND CHARTING SUBSYSTEMS |
View |
| 265 | HIGH RESOLUTION RECONNAISSANCE (SAMOS) | View |
| 266 | HISTORICAL BRIEF AND CHRONOLOGY AIR FORCE SATELLITE CONTROL FACILITY, 1954-PRESENT PART B | View |
| 267 | HISTORICAL BRIEFING USAF R&D ORGANIZATION 1960-1962 | View |
| 268 | HISTORICAL CHRONOLOGY, 1 JULY 1961 - 31 DECEMBER 1961 | View |
| 269 | HISTORICAL EXPLANATION AND CHRONOLOGY WS 117L DISCOVERER, SENTRY AND MIDAS 1946-1959 PART B | View |
| 270 | HISTORICAL EXPLANATION, WS 117L, DISCOVERER | View |
| 271 | HISTORICAL RECORD OF THE 552ND AEW&C WING (ADC) MCCLELLAN AFB, CALIFORNIA | View |
| 272 | HISTORICAL REPORT - AFPR - LOCKHEED MISSILES AND SPACE DIVISION, - 1 JUL-31 DEC 59 | View |
| 273 | HISTORICAL REPORT - WS 117L, 1 JAN-31 DEC 56 | View |
| 274 | HISTORICAL REPORTS - AERO MEDICAL FIELD LABORATORY PART B | View |
| 275 | HISTORICAL SUMMARY AIR PHOTOGRAPHIC CHARTING SERVICE APR 51-DEC 62 | View |
| 276 | HISTORY - AGENA AS OF 31 DEC67, VOLUME I | View |
| 277 | HISTORY - AIR FORCE HISTORY OF SPACE ACTIVITIES, USAF HISTORICAL DIVISION LIAISON OFFICE PART A | View |
| 278 | HISTORY AIR MATERIEL COMMAND TEST SITE 1 JUL59-31 DEC59, HISTORY #4 | View |
| 279 | HISTORY DIRECTORATE OF COLLECTION OFFICE, ACS/INTELLIGENCE 1 JAN-30 JUN 60 | View |
| 280 | HISTORY OF 6593RD TEST SQUADRON (SPECIAL) (ARDC), 1 JAN - 30 JUNE 1959 | View |
| 281 | HISTORY OF ACTIONS ON WS 117L, GEN SCHRIEVER JAN 58 | View |
| 282 | HISTORY OF ACTIONS ON WS117L ADVANCED RESEARCH PROJECTS AGENCY (ARPA) OCTOBER 1958 | View |
| 283 | HISTORY OF AGENA VOLUME FIVE PART B | View |
| 284 | HISTORY OF AGENA VOLUME FOUR PART B | View |
| 285 | HISTORY OF AGENA VOLUME SIX PART B | View |
| 286 | HISTORY OF AGENA VOLUME THREE PART B | View |
| 287 | HISTORY OF AGENA VOLUME TWO PART B | View |
| 288 | HISTORY OF DCAS 1961 ORIGINS OF THE USAF SPACE PROGRAM 1945-1956, VOLUME 5 | View |
| 289 | HISTORY OF DISCOVERER - ROUGH DRAFT, APPENDIXES C, D, E AND F | View |
| 290 | HISTORY OF DISCOVERER VOLUME I PART B | View |
| 291 | HISTORY OF DISCOVERER VOLUME ONE PART A | View |
| 292 | HISTORY OF DISCOVERY (ROUGH DRAFT) PART B | View |
| 293 | HISTORY OF EARLY "DISCOVERER" | View |
| 294 | HISTORY OF PROGRAM 461 PART B | View |
| 295 |
HISTORY OF SAFSP: SAMOS/MIDAS/SENTRY/DISCOVERER-THOR. 30
DOCUMENTS DATING FROM 15 MARCH 1955 THROUGH 31 FEBRUARY 1961 |
View |
| 296 | HISTORY OF SAMOS - INDEX OF DOCUMENTS 1 TO 282 | View |
| 297 | HISTORY OF SAMOS VOL. I | View |
| 298 | HISTORY OF SAMOS VOLUME II HISTORY OFFICE, CHIEF OF STAFF, SPACE & MISSILE SYSTEMS ORGANIZATION PART A | View |
| 299 |
HISTORY OF SAMOS, VOL I, DOCUMENTS 1 TO 77, HISTORY OFFICE
CHIEF OF STAFF, SPACE AND MISSILE SYSTEMS ORGANIZATION PART B |
View |
| 300 |
HISTORY OF SAMOS, VOL II, DOCUMENTS 78-182, HISTORY OFFICE
CHIEF OF STAFF SPACE AND MISSILE SYSTEMS ORGANIZATION PART A |
View |
| 301 |
HISTORY OF SAMOS, VOL III, DOCUMENTS 183-282, HISTORY OFFICE
CHIEF OF STAFF, SPACE AND MISSILE SYSTEMS ORGANIZATION PART A |
View |
| 302 | HISTORY OF SAMOS, WS 117L, DISCOVERER, VOLUME I, SENTRY/MIDAS/CORONA, PART B | View |
| 303 | HISTORY OF SATELLITE RECONNAISSANCE - VOLUME IIB - SAMOS E-5 AND E-6 (PERRY HISTORY) | View |
| 304 | HISTORY OF SATELLITE RECONNAISSANCE VOLUME IIA, PART B | View |
| 305 | HISTORY OF THE 1ST MISSILE DIVISION PART B | View |
| 306 | HISTORY OF THE 4TH WEATHER GROUP 1 JUL60-31 DEC60 | View |
| 307 |
HISTORY OF THE STRATEGIC AIR COMMAND; STRATEGIC AIR COMMAND
PARTICIPATION IN THE MISSILE PROGRAM, 1/1/58-6/30/58 |
View |
| 308 | HISTORY OF WS 117L (1946 TO REDEFINITION) SYSTEMS COMMAND VOLUME II, PART B | View |
| 309 | HISTORY OF WS 117L ROUGH DRAFT PART B | View |
| 310 | HISTORY OF WS-117L, VOL I, HISTORY OFFICE CHIEF OF STAFF SPACE AND MISSILE SYSTEMS ORGANIZATION PART B | View |
| 311 | HISTORY SPACE SYSTEMS DIVISION BACKGROUND OF THE SPACE SYSTEMS DIVISION JANUARY-JUNE 1962 VOL I PART B | View |
| 312 | HISTORY, AIR FORCE EASTERN TEST RANGE, SEPT65 THE RANGE QUARTERLY | View |
| 313 | HISTORY: AIR FORCE MISSILE & SPACE DEVELOPMENT FACILITIES, LOS ANGELES, CALIF 1954-1964 | View |
| 314 | HISTORY: EVOLUTION OF THE AFBMD ADVANCED BALLISTIC MISSILE AND SPACE PROGRAM (1955-1958) | View |
| 315 | HISTORY: U.S. AIR FORCE ORAL HISTORY INTERVIEW HONORABLE JOHN L. MCLUCAS | View |
| 316 |
HQS OPERATING INSTRUCTION NO. 25-5 MANAGEMENT ENGINEERING
BASIC POLICY CONCERNING SATELLITE RECONNAISSANCE |
View |
| 317 | IDA-IM-122, DATED 11 SEPT 1959, MEMO FOR COMMANDER, AIR RESEARCH AND DEVELOPMENT COMMAND | View |
| 318 | INDEX OF CLEARED POLICY STATEMENTS | View |
| 319 | INDEX OF VARIOUS DOCUMENTS AND MEMORANDA | View |
| 320 | INDEX OF VARIOUS DOCUMENTS RE SAMOS | View |
| 321 | INFORMATION FOR PRESENTATION REGARDING FY-60 FUNDS FOR DR. KILLIAN | View |
| 322 | INFORMATION NEEDED BY THE ADVISORY GROUP FOR THE ODER-KING MEETING ON 6/24/60 | View |
| 323 | INFORMATION PERTAINING TO WS 117L | View |
| 324 | INFORMATION TRANSMISSION VERSUS RECOVERY | View |
| 325 |
INFORMATION TURNED OVER TO COLONEL ODER, MR. GEORGE W.
GODDARD, DIRECTOR PHOTOGRAPHIC DIVISION, BULOVA WATCH COMPANY, INC. |
View |
| 326 | INFRARED RECONNAISSANCE SUBSYSTEM FOR ARS WS117L, PART B | View |
| 327 | INTEGRATION OF COMINT CAPABILITY INTO THE SAMOS SYSTEM | View |
| 328 |
INTERCHANGEABILITY OF INTERCONTINENTAL BALLISTIC MISSILE
(ICBM), INTERMEDIATE RANGE BALLISTIC MISSILE (IRBM), AND WS 117L HARDWARE AND MUTUAL INTERFERENCE OF THESE PROGRAMS |
View |
| 329 | INTERDEPARTMENTAL CONTINGENCY PLANNING COMMITTEE | View |
| 330 | INTERFERENCE BETWEEN WS 117L AND WS 107A | View |
| 331 | INTERIM SATELLITE EARLY WARNING SYSTEM/MIDAS AND PHASE I OF THE SATELLITE RECONNAISSANCE SYSTEM | View |
| 332 | INTERVIEW COL. THOMAS O. HAIG (USAF, RET) INTERVIEWED BY CAPTAIN DAVID ARNOLD (USAF) | View |
| 333 | INTRODUCTORY PLANNING ON WS-117L TEST ACTIVITIES AT AIR FORCE MISSILE TEST CENTER (AFMTC) | View |
| 334 | ITEMS FOR 25 OCT MEETINGS OF ARDC BALLISTIC MISSILE AND SPACE VEHICLE COMMITTEE | View |
| 335 | ITEMS RECOMMENDED FOR INSERTION IN THE AIR FORCE BALLISTIC MISSILE DIVISION CHRONOLOGY | View |
| 336 |
ITEMS SUBMITTED BY DOD FOR POSSIBLE INCLUSION IN THE DAILY
SUMMARY FOR THE PRESIDENT: DISCOVERER V LAUNCH SCHEDULE FOR 28 JULY 1959 |
View |
| 337 |
ITEMS SUBMITTED BY THE DEFENSE DEPT FOR POSSIBLE INCLUSION
IN THE DAILY SUMMARY FOR THE PRESIDENT: DISCOVERER LAUNCH SCHEDULED 21 MAY 59, PROJECT MIDAS, LAUNCH OF THOR MISSILE NUMBER 191 |
View |
| 338 |
ITEMS SUBMITTED BY THE DEPARTMENT OF DEFENSE FOR POSSIBLE
INCLUSION IN THE DAILY SUMMARY FOR THE PRESIDENT, DISCOVERER III EVALUATION AND DISCOVERER IV SCHEDULE |
View |
| 339 |
ITEMS SUBMITTED BY THE DEPARTMENT OF DEFENSE FOR POSSIBLE
INCLUSION IN THE DAILY SUMMARY FOR THE PRESIDENT, DISCOVERER/MIDAS |
View |
| 340 |
ITEMS SUBMITTED BY THE DEPARTMENT OF DEFENSE FOR POSSIBLE
INCLUSION IN THE DAILY SUMMARY FOR THE PRESIDENT: ANALYSIS OF DISCOVERER LAUNCHES |
View |
| 341 |
ITEMS SUBMITTED BY THE DEPARTMENT OF DEFENSE FOR POSSIBLE
INCLUSION IN THE DAILY SUMMARY FOR THE PRESIDENT: DISCOVERER I LAUNCH ATTEMPT |
View |
| 342 |
ITEMS SUBMITTED BY THE DEPARTMENT OF DEFENSE FOR POSSIBLE
INCLUSION IN THE DAILY SUMMARY FOR THE PRESIDENT: DISCOVERER II RECOVERY AND CHANGES IN DISCOVERER III |
View |
| 343 |
ITEMS SUBMITTED BY THE DEPARTMENT OF DEFENSE FOR POSSIBLE
INCLUSION IN THE DAILY SUMMARY FOR THE PRESIDENT: DISCOVERER II RECOVERY CAPSULE AND FINALE OF VEHICLE |
View |
| 344 |
ITEMS SUBMITTED BY THE DEPARTMENT OF DEFENSE FOR POSSIBLE
INCLUSION IN THE DAILY SUMMARY FOR THE PRESIDENT: DISCOVERER V & VI |
View |
| 345 |
ITEMS SUBMITTED BY THE DEPARTMENT OF DEFENSE FOR POSSIBLE
INCLUSION IN THE DAILY SUMMARY FOR THE PRESIDENT: INITIAL LAUNCHING OF DISCOVERER SATELLITE |
View |
| 346 |
ITEMS SUBMITTED BY THE DEPARTMENT OF DEFENSE FOR POSSIBLE
INCLUSION IN THE DAILY SUMMARY FOR THE PRESIDENT: LAUNCH OF DISCOVERER IX |
View |
| 347 |
ITEMS SUBMITTED BY THE DEPARTMENT OF DEFENSE FOR POSSIBLE
INCLUSION IN THE DAILY SUMMARY FOR THE PRESIDENT: LAUNCH OF DISCOVERER XIII |
View |
| 348 |
ITEMS SUBMITTED BY THE DEPARTMENT OF DEFENSE FOR POSSIBLE
INCLUSION IN THE DAILY SUMMARY FOR THE PRESIDENT: LAUNCH OF SAMOS I |
View |
| 349 | JOINT TENANCY AGREEMENT BETWEEN THE PACIFIC MISSILE RANGE AND THE AFBMD FEB 1960 | View |
| 350 | JOINT TENANCY SUPPORT AGREEMENT BETWEEN THE PACIFIC MISSILE RANGE AND AFBMD JAN 1960 | View |
| 351 | LAND RECOVERY IMPLEMENTATION PLAN | View |
| 352 | LAUNCH REPORT LV 2A/389 SS-01A/1174, PROGRAM 162, FLIGHT NO. 76, LAUNCHED 15 FEB 1964 | View |
| 353 | LAUNCH REPORT LY-2A/395 SS-01A/1604, PROGRAM 162 FLIGHT NO. 78, LAUNCHED 27 APRIL 1964 | View |
| 354 | LAUNCH TEST DIRECTIVE PROGRAM 162 CONTRACT AF 04 (695)-233 PART B | View |
| 355 | LETTER ON THE USE OF VANDENBERG AIR FORCE BASE 65-1 LAUNCHERS FOR THE 117L PROGRAM | View |
| 356 |
LETTER FROM THE SECDEF TO THE PRESIDENT FORWARDING THE
MILITARY SPACE PROJECTS REPORT FOR THE QUARTER ENDED JUNE 30, 1959, DISCOVERER, TIROS, SAMOS |
View |
| 357 | LETTER FROM USAF PROVIDING UP-DATE ON REVISION OF THE SAMOS DEVELOPMENT PLAN | View |
| 358 | LETTER OF APPRECIATION FOR ADVANCED RECONNAISSANCE SYSTEM BRIEFING FROM O.J. RITLAND | View |
| 359 |
LETTER OF APPRECIATION FOR SUPPORT ON RECENT DISCOVERER
CAPSULE SEARCH TO COMMANDER-IN-CHIEF, ROYAL NORWEGIAN AIR FORCE |
View |
| 360 | LETTER OF APPRECIATION TO GENERAL KUTER FOR CONTRIBUTION TO WS-117L PROGRAM, FROM B.A. SCHRIEVER | View |
| 361 | LETTER OF APPRECIATION TO: COL F.E. ODER FROM BRIG. GENERAL O.J. RITLAND | View |
| 362 | LETTER REGARDING MEMO TITLED: "RECOVERY PLAN FOR DISCOVERER" | View |
| 363 |
LETTER RITLAND TO GRADLE RE NEED FOR RELIABLE AND
INSTANTANEOUS COMMS IN SUPPORT OF THE SENTRY PROJECT |
View |
| 364 | LETTER TO GENERAL WHITE, MIDAS DEVELOPMENT PROGRAM | View |
| 365 |
LETTER TO THE PRESIDENT: MILITARY RECONNAISSANCE SATELLITE
PROGRAM PROGRESS REPORT FOR THE QUARTER ENDING SEPTEMBER 30, 1958 |
View |
| 366 | LETTER WITH SUMMARY OF PROGRESS ON THE MILITARY SPACE PROJECTS DURING JUNE, JULY, AND AUGUST 1960 | View |
| 367 | LETTER WITH SUMMARY OF PROGRESS ON THE MILITARY SPACE PROJECTS DURING MARCH, APRIL, AND MAY 1960 | View |
| 368 | LETTER: AWS, AN AIR FORCE METEOROLOGICAL SATELLITE SYSTEM | View |
| 369 |
LETTERS OF INQUIRY FROM SENATE PREPAREDNESS INVESTIGATING
SUBCOMMITTEE AND LOCKHEED MISSILE SYSTEMS DIVISION REPLY THERETO |
View |
| 370 | LOCKHEED AIRCRAFT COMPANY CONFIDENCE IN QUESTION ON CARRYING OUT WS117L PROGRAM | View |
| 371 |
LOCKHEED AIRCRAFT CORPORATION CONTRACT AF04(647)-558
DISCOVERER XIII (AGENA 1057/THOR231) SYSTEM TEST EVALUATION & PERFORMANCE ANALYSIS REPORT 35 DAY REPORT PART A |
View |
| 372 |
LOCKHEED AIRCRAFT CORPORATION CONTRACT AF04(647)-558
DISCOVERER XIII (AGENA 1057/THOR231) SYSTEM TEST EVALUATION & PERFORMANCE ANALYSIS REPORT 35 DAY REPORT PART B |
View |
| 373 | LOCKHEED MANAGEMENT SURVEY | View |
| 374 | MAJOR DISCOVERER PROGRAMMING ACTIONS | View |
| 375 | MANAGEMENT ENGINEERING PROGRAM PRELIMINARY STUDY AGENA LAUNCH VEHICLE DIRECTORATE | View |
| 376 | MANAGEMENT OF SPACE VEHICLE TRACKING AND SURVEILLANCE STATIONS IN PACIFIC AREA | View |
| 377 |
MANAGEMENT OF THE NATIONAL RECONNAISSANCE PROGRAM LETTER TO
ALLEN W. DULLES FROM ROSWELL GILPATRIC |
View |
| 378 | MANAGEMENT PRACTICES, EVENTS WHICH CAUSE CONCERN | View |
| 379 | MANAGEMENT PROBLEM WITHIN THE LOCKHEED AIRCRAFT CORPORATION | View |
| 380 | MANPOWER AND FUNCTION, FUNCTIONAL STATEMENTS | View |
| 381 | MATERIAL FOR PUBLIC RELEASE, NO. 350, THE US HAS LAUNCHED OVER 650 SPACECRAFT | View |
| 382 | MATERIAL RELATED TO WORK OF BALLISTIC MISSILE AND SPACE VEHICLE COMMITTEE | View |
| 383 | MEETING OF TECHNICAL ADVISORS TO WS 117L | View |
| 384 | MEETING ON GROUND DATA PROCESSING EQUIPMENT | View |
| 385 | MEETING WITH KILLIAN SUBCOMMITTEE ON SPACE WITH REFERENCE TO PROJECT BAKER | View |
| 386 | MEETINGS ON 10, 11 AND 12 NOVEMBER 1958, ON SATELLITE DETECTION AND SURVEILLANCE SYSTEM DEVELOPMENT | View |
| 387 | MEMO - BOOSTER - 117L INTEGRATION PLAN - AFMTC | View |
| 388 | MEMO - DISCOVERER IV PRELIMINARY FLIGHT INFORMATION LETTER | View |
| 389 | MEMO - RECONNAISSANCE SATELLITE PROGRAM, MEMO FOR THE SECRETARY OF THE AIR FORCE | View |
| 390 | MEMO - SATELLITE RECONNAISSANCE CONTINGENCY PLAN | View |
| 391 | MEMO - SPOT WEATHER FORECASTS FOR MISSION 9032 | View |
| 392 | MEMO FOR AF CHIEF OF STAFF CHANGES IN THE CHARACTER AND SCOPE OF THE SAMOS TECHNICAL PROGRAM | View |
| 393 | MEMO FOR CHIEF OF STAFF AIR FORCE STATUS OF USAF ASTRONAUTICS PROGRAM | View |
| 394 | MEMO FOR D/ARPA, OSD, AIR FORCE MAN-IN-SPACE PROGRAM | View |
| 395 |
MEMO FOR GEN ANDERSON, MEETING WITH BISSELL, GEN FLICKINGER
AND COL APPOLD RE WS117L PROGRAM DOLLARS |
View |
| 396 | MEMO FOR SCHRIEVER AND RITLAND, USE OF 315 BOOSTERS | View |
| 397 | MEMO FOR SCHRIEVER RE NORTH AMERICAN AVIATION PRESENTATION ON SATELLITES AND MOON ROCKETS | View |
| 398 | MEMO FOR SECDEF AND DCI: NATIONAL RECONNAISSANCE PROGRAM | View |
| 399 | MEMO FOR THE SECRETARY OF THE AIR FORCE, SUBJECT: FY-1959-117L PROGRAM | View |
| 400 | MEMO FOR VICE CHIEF OF STAFF: MAN IN SPACE PROGRAM | View |
| 401 | MEMO FROM ARPA #41-60 AMENDMENT #3, TO ARDC | View |
| 402 | MEMO GUIDANCE AND CONTROL FOR WS-117L | View |
| 403 | MEMO OF NOVEMBER 14TH CONCERNING TRACKING STATIONS FOR THE SENTRY PROGRAM | View |
| 404 | MEMO PR-58-BMD-319 FOR DESTRUCT RECEIVER | View |
| 405 | MEMO PROJECT ABLE PHASE II | View |
| 406 | MEMO RE FY-59 117L PROGRAM | View |
| 407 | MEMO RE STRUCTURE WITHIN THE SPACE AND MISSILE ORGANIZATION SYSTEM | View |
| 408 | MEMO RE TRANSFER OF LENSES | View |
| 409 | MEMO SENTRY INTELLIGENCE REQUIREMENTS FOR SENTRY, FOR DARPA | View |
| 410 | MEMO TO CHAIRMAN, ADVISORY GROUP ON SPECIAL CAPABILITIES, SATELLITE PROGRAMS | View |
| 411 | MEMO TO DOUGLAS AIRCRAFT RE FAILURE OF THE BOOSTER ON DISCOVERER | View |
| 412 | MEMO TO DR. DUNN, SPACE FLIGHT PROGRAM | View |
| 413 | MEMO TO GEN RITLAND: SPECIAL STL ANALYSIS OF DISCOVERER PROBLEMS | View |
| 414 | MEMO TO PSAC PANEL - REVIEW OF THE 117L SYSTEM SAMOS/TIROS | View |
| 415 |
MEMO TO SCHRIEVER AND RITLAND: AF REPUTATION WITH STEWART
COMMITTEE, OFFICE OF SECRETARY OF DEFENSE (OSD), AND HOW THIS INFLUENCES AF ASTRONAUTIC PROGRAMMING ACTION |
View |
| 416 | MEMO WS 117L PROGRAM DATA | View |
| 417 | MEMO WS 315A, WS 107A-1-117L TEST DISCUSSIONS AT AF MISSILE TEST CENTER (AFMTC) - FEBRUARY 18, 19, 20 | View |
| 418 |
MEMO WS117L AFMTC TEST OPERATIONS - CONVAIR PARTICIPATION -
SECOND MEETING BETWEEN AFBMD AND LOCKHEED MISSILE AND SPACE |
View |
| 419 | MEMO WS-117L OPERATIONS AT AFMTC AND COOKE AIR FORCE BASE | View |
| 420 | MEMO: SECURITY MEASURES FOR WS 117L | View |
| 421 | MESSAGE FROM ANDREWS AFB TO HQ USAF RE TRANSITION FROM C-119 AIRCRAFT TO C-130S | View |
| 422 | MESSAGE FROM HQ USAF RE MISSION OF AERIAL RECOVERY | View |
| 423 | MESSAGE FROM USAF RE DELAY OF CONSTRUCTION OF FACILITY | View |
| 424 | MESSAGE RE AF RESPONSIBLE FOR ALL MILITARY CONSTRUCTION OF THE 117L PROGRAM | View |
| 425 |
MESSAGE RE AF STUDIES OF SEVERAL PROJECTS AND EXTENSION OF
DUE DATE FOR WS 117L REPROGRAMMING INFO FROM 15 JAN TO 2 FEB 59 |
View |
| 426 | MESSAGE RE CLARIFICATION OF RECOVERY LAUNCH IN 1961 | View |
| 427 | MESSAGE RE DARPA BRIEFING ON MANAGEMENT PROBLEMS | View |
| 428 | MESSAGE RE FACILITIES TO BE PART OF OPERATIONAL WEAPON SYSTEMS | View |
| 429 | MESSAGE RE FY-60 FUNDS FOR SPACE AND MISSILE ORGANIZATION | View |
| 430 | MESSAGE RE LOCATION OF MISSILE ASSEMBLY BUILDING FOR WS 117L PROGRAM | View |
| 431 | MESSAGE RE LOCATION OF WS-117L | View |
| 432 | MESSAGE RE PROCEEDING WITH ADVERTISING FOR CONSTRUCTION CONTRACT AWARD | View |
| 433 | MESSAGE RE TERMINATION OF CONSTRUCTION AT OFFUTT, AFB | View |
| 434 | MESSAGE REQUEST FOR PROGRAM COSTS | View |
| 435 | MESSAGE TO AF SECRETARY TO PROCEED WITH NEGOTIATIONS ON THE SPACE AND MISSILE READOUT PROGRAM | View |
| 436 | MESSAGE TO DENVER DATA PROCESSING LABORATORY: SUGGESTED CATEGORIES FOR DISCUSSION | View |
| 437 | METEOROLOGICAL CONDITIONS AT VANDENBERG AIR FORCE BASE | View |
| 438 | MIDAS $20,200,000 FY59 PHASE I PROGRAM RE TO FOUR EXPERIMENTAL FLIGHTS IS APPROVED | View |
| 439 | MIDAS AND DISCOVERER FLIGHT SCHEDULE, AS PRESENTED AT LOCKHEED AIRCRAFT CORP | View |
| 440 | MIDAS BACKGROUND | View |
| 441 | MIDAS INTERIM SATELLITE EARLY WARNING SYSTEM | View |
| 442 | MIDAS URGENT NEED TO PROCEED WITH FACILITY SITING ACTIONS FOR MIDAS | View |
| 443 | MIDAS/SAMOS/DISCOVERER HANDWRITTEN NOTES ON FUNDING | View |
| 444 | MILITARY OPERATIONS IN SPACE | View |
| 445 | MILITARY SATELLITE PROGRAM FOR MONTH OF FEBRUARY 1959 | View |
| 446 | MILITARY SATELLITE PROGRAM FOR QUARTER ENDING 30 JUNE 1959 | View |
| 447 | MILITARY SATELLITE PROGRAM FOR QUARTER ENDING 30 SEPTEMBER 1959 | View |
| 448 | MILITARY SATELLITE PROGRAM FOR QUARTER ENDING 31 DECEMBER 1958 | View |
| 449 | MILITARY SATELLITE PROGRAM FOR QUARTER ENDING 31 DECEMBER 1959 | View |
| 450 | MILITARY SATELLITE PROGRAM FOR QUARTER ENDING 31 MAY 1960 | View |
| 451 | MILITARY SATELLITE PROGRAM STATUS REPORT FOR THE MONTH ENDING 31 JANUARY 1959 | View |
| 452 | MILITARY SATELLITE PROGRAMS PROGRESS REPORT FOR JANUARY AND FEBRUARY 1960 | View |
| 453 | MILITARY SATELLITE PROGRAMS PROGRESS REPORT FOR MONTH ENDING 28 FEBRUARY 1961 | View |
| 454 | MILITARY SATELLITE PROGRAMS PROGRESS REPORT FOR MONTH ENDING 31 DECEMBER 1961 | View |
| 455 | MILITARY SATELLITE PROGRAMS PROGRESS REPORT FOR MONTH ENDING 31 JANUARY 1961 | View |
| 456 | MILITARY SATELLITE PROGRAMS PROGRESS REPORT FOR MONTH ENDING 31 MAY 1961 | View |
| 457 | MILITARY SATELLITE PROGRAMS PROGRESS REPORT FOR QUARTER ENDING 31 AUGUST 1960 | View |
| 458 | MILITARY SATELLITE PROGRAMS PROGRESS REPORT FOR QUARTER ENDING 31 MAY 1960 | View |
| 459 | MILITARY SATELLITE PROGRAMS PROGRESS REPORT MONTH ENDING 30 JUNE 1960 | View |
| 460 | MILITARY SATELLITE PROGRAMS PROGRESS REPORT MONTH ENDING 30 NOVEMBER 1960 | View |
| 461 | MILITARY SATELLITE PROGRAMS PROGRESS REPORT MONTH ENDING 30 SEPTEMBER 1960 | View |
| 462 | MILITARY SATELLITE PROGRAMS PROGRESS REPORT MONTH ENDING 31 APRIL 1960 | View |
| 463 | MILITARY SATELLITE PROGRAMS PROGRESS REPORT MONTH ENDING 31 DECEMBER 1960 | View |
| 464 | MILITARY SATELLITE PROGRAMS PROGRESS REPORT MONTH ENDING 31 JULY 1960 | View |
| 465 | MILITARY SATELLITE PROGRAMS PROGRESS REPORT MONTH ENDING 31 MARCH 1960 | View |
| 466 | MILITARY SATELLITE PROGRAMS PROGRESS REPORT MONTH ENDING 31 OCTOBER 1960 | View |
| 467 | MILITARY SATELLITE SYSTEMS 1957-1960 | View |
| 468 | MILITARY SPACE PROJECTS PROGRESS REPORT FOR JANUARY-FEBRUARY 1960, DISCOVERER/MIDAS/SAMOS | View |
| 469 | MILITARY SPACE PROJECTS REPORT FOR QUARTER ENDED 31 DECEMBER 1959 | View |
| 470 | MILITARY SPACE PROJECTS REPORT FOR THE QUARTER ENDED 30 JUNE 1959 | View |
| 471 |
MILITARY SPACE PROJECTS REPORT OF PROGRESS FOR QUARTER
ENDING 31 DECEMBER 1959, DISCOVERER/SAMOS/MIDAS |
View |
| 472 | MINUTES OF THE FORTY-FIFTH MEETING ON THE AIR FORCE BALLISTIC MISSILE COMMITTEE | View |
| 473 | MISSILE AND SATELLITE SYSTEMS, TO: DEPUTIES, DIRECTORS, AND CHIEFS OF COMPARABLE OFFICES (NO. 15) | View |
| 474 | MODIFICATION OF COMPLEX 75-1, CONTRACT NUMBER AF 04 (647)-558 | View |
| 475 | MONTHLY SUMMARY OF SPACE SYSTEMS DIVISION ACTIVITIES APRIL 1961, PART B | View |
| 476 | MONTHLY SUMMARY OF SPACE SYSTEMS DIVISION ACTIVITIES AUGUST 1961 | View |
| 477 | MONTHLY SUMMARY OF SPACE SYSTEMS DIVISION ACTIVITIES JULY 1961 | View |
| 478 | MONTHLY SUMMARY OF SPACE SYSTEMS DIVISION ACTIVITIES JUNE 1961 | View |
| 479 | MONTHLY SUMMARY OF SPACE SYSTEMS DIVISION ACTIVITIES MARCH 1961 | View |
| 480 | MONTHLY SUMMARY OF SPACE SYSTEMS DIVISION ACTIVITIES MAY 1961 | View |
| 481 | MONTHLY SUMMARY OF SPACE SYSTEMS DIVISION ACTIVITIES OCTOBER 1961 | View |
| 482 | MONTHLY SUMMARY OF SPACE SYSTEMS DIVISION ACTIVITIES SEPTEMBER 1961 | View |
| 483 | NATIONAL RANGE PROGRAM PLANNING & RELATED FUNDING POLICY | View |
| 484 | NEWS RELEASE, AGENA FACT SHEET, REL-59-64 | View |
| 485 | NEWS RELEASE, AIR FORCE REORGANIZES FOR SPACE MISSIONS, 58-36 | View |
| 486 | NOMINATION OF CAMP COOKE REPRESENTATIVE | View |
| 487 | NOTE RE IMMEDIATE SATELLITE EFFORT USING THOR AND THIRD STAGE VANGUARD | View |
| 488 |
OFFICE OF MISSILE AND SATELLITE SYSTEMS FOR THE DIRECT
SUPERVISION AND CONTROL OF THE SAMOS PROJECT HAS BEEN ESTABLISHED |
View |
| 489 | OPERATIONAL DATA FOR WS 107A-1, WS 107A-2, WS 315A AND WS 117L | View |
| 490 | OPERATIONS COORDINATING BOARD (OCB), SAMOS LAUNCHING | View |
| 491 | ORGANIZATION AND FUNCTIONS OF THE AIR FORCE SATELLITE PHOTOGRAPHIC PROCESSING LABORATORY, NO. 116.2 | View |
| 492 | ORGANIZATION AND FUNCTIONS OF THE OFFICE OF SPACE SYSTEMS, SECRETARY OF THE AIR FORCE ORDER NO. 115.1 | View |
| 493 | ORGANIZATION AND MANNING FOR WS 117L PROGRAM | View |
| 494 | PAD UTILIZATION | View |
| 495 | PERSONNEL ACTIONS MEMORANDUM NUMBER 16 | View |
| 496 | PERSONNEL ACTIONS MEMORANDUM NUMBER 21 AND MEMO FOR THE RECORD, SUBJECT: SPACE INSTITUTE | View |
| 497 | PICTORIAL PRESENTATION OF SUBSYSTEM E SAMOS SATELLITE | View |
| 498 |
PIED PIPER ADVANCED RECONNAISSANCE SYSTEM PROGRAM; TECHNICAL
DEVELOPMENT PROGRAM NICKNAME "PIED PIPER"; PROJECT 1115 MX 2226 BROCHURE BY WILLIAM KING LT. COL. USAF |
View |
| 499 | PIED PIPER DEVELOPMENT PLAN - VOLUME II SUBSYSTEM PLAN - A. AIRFRAME, PART B | View |
| 500 | PIED PIPER DEVELOPMENT PLAN - VOLUME II SUBSYSTEM PLAN - B. PROPULSION | View |
| 501 | PIED PIPER DEVELOPMENT PLAN - VOLUME II SUBSYSTEM PLAN - D. GUIDANCE AND CONTROL, PART B | View |
| 502 | PIED PIPER DEVELOPMENT PLAN - VOLUME II SUBSYSTEM PLAN - E. VISUAL RECONNAISSANCE | View |
| 503 | PIED PIPER DEVELOPMENT PLAN - VOLUME II SUBSYSTEM PLAN - F. ELECTRONIC RECONNAISSANCE, PART B | View |
| 504 | PIED PIPER DEVELOPMENT PLAN - VOLUME II SUBSYSTEM PLAN - G. INFRARED RECONNAISSANCE | View |
| 505 | PIED PIPER DEVELOPMENT PLAN - VOLUME II SUBSYSTEM PLAN - H. VEHICLE ELECTRONICS | View |
| 506 | PIED PIPER DEVELOPMENT PLAN - VOLUME II SUBSYSTEM PLAN - I. AIRBORNE TEST SYSTEMS | View |
| 507 |
PIED PIPER DEVELOPMENT PLAN - VOLUME II SUBSYSTEM PLAN - J.
VEHICLE INTERCEPT AND CONTROL, GROUND STATION |
View |
| 508 | PIED PIPER DEVELOPMENT PLAN - VOLUME II SUBSYSTEM PLAN - K. GROUND DATA PROCESSING | View |
| 509 | PIED PIPER DEVELOPMENT PLAN - VOLUME II SUBSYSTEM PLAN - L. GROUND SUPPORT AND TEST INSTRUMENTATION | View |
| 510 | POINT OF VEHICLE ACCEPTANCE, CONTRACT AF 04 (647)-97 | View |
| 511 | POLICY CONCERNING ATTENDANCE AT WS 117L PROGRAM REVIEWS AND VISITS TO PROGRAM SITES | View |
| 512 | POLICY GUIDANCE FOR CONGRESSIONAL WITNESSES REGARDING SPACE AND MISSILE ORGANIZATION SYSTEM | View |
| 513 | POLICY, MISSILE AND SPACE VEHICLE FLIGHT SAFETY | View |
| 514 | PRELIMINARY CONSIDERATIONS FOR MILITARY SPACE SYSTEMS VOLUME ONE PART B | View |
| 515 |
PRESENTATION MADE BY MR. JOHN RUBEL TO THE NATIONAL SECURITY
COUNCIL ON 7 NOVEMBER 1960 ON DOD SPACE PROGRAMS |
View |
| 516 | PRESENTATION OF LOCKHEED AGENA B TO THE NATIONAL AIR MUSEUM BY THE USAF | View |
| 517 | PRESIDENTIAL APPROVAL OF ADVANCED RESEARCH PROJECTS AGENCY (ARPA) PROJECTS | View |
| 518 | PROGRAM 662A DECEMBER 1961 ABBREVIATED PROGRAM PLAN PART B | View |
| 519 | PROGRAM OBJECTIVES AND RELATED FUNDING FOR THE DISCOVERER PROGRAM ARE APPROVED | View |
| 520 | PROGRESS OF RECONNAISSANCE DEVELOPMENT PROJECTS | View |
| 521 | PROGRESS REPORT ON WS 117L, MEMO TO COL RITLAND | View |
| 522 | PROJECT 117L | View |
| 523 | PROJECT DISCOVERY | View |
| 524 | PROJECT RAND RECOMMENDATION TO THE AIR STAFF | View |
| 525 | PROJECT RAND'S SATELLITE | View |
| 526 | PROPOSED TIME TABLE FOR E-6 CONFIGURATION OF SAMOS COMPETITION | View |
| 527 | PURCHASE REQUEST BE PREPARED FOR THE PROCUREMENT OF WORK DESCRIBED IN "STATEMENT OF WORK, 117L" | View |
| 528 | PURCHASE REQUEST, MASSACHUSETTS INSTITUTE OF TECHNOLOGY | View |
| 529 | QUESTIONNAIRE - WS 117L | View |
| 530 |
RAMO-WOOLDRIDGE (A-W) RESPONSIBILITY IN THE ADVANCED
RECONNAISSANCE SYSTEM (ARS) PROGRAM, MEMO FOR COL TERHUNE |
View |
| 531 | RAMO-WOOLDRIDGE (EXCLUSION) OF HARDWARE CLAUSE IN THE R-W CONTRACT | View |
| 532 | RAMO-WOOLDRIDGE (R-W) STL RESPONSIBILITIES IN THE WS 117L PROGRAM | View |
| 533 | RAMO-WOOLDRIDGE SUPPORT OF WS 117L CONTRACTOR | View |
| 534 | RAMO-WOOLRIDGE R-W RESPONSIBILITY IN THE ARS PROGRAM | View |
| 535 | RAMO-WOOLRIDGE RESPONSIBILITY IN CONNECTION WITH THE WS 117L PROGRAM | View |
| 536 | RAMO-WOOLRIDGE RESPONSIBILITY IN RESEARCH AND IN EXPERIMENTAL WORK ON CONTRACT 1190 | View |
| 537 | RAMO-WOOLRIDGE RESPONSIBILITY IN THE ARS PROGRAM | View |
| 538 | RAND RECOMMENDATION ON WS 117L PROGRAM | View |
| 539 |
RAND, ATTEMPTING TO SIMULATE ARS OPS CAPABILITIES AS
REALISTICALLY AS POSSIBLE, REQUIRES CMM PHOTOGRAPHIC COVERAGE |
View |
| 540 | RCA VERSUS GE OPERATION OF SAN SALVADOR STATION | View |
| 541 | RDGB DIARY FOR WEEK 11-16 JUNE 1956 | View |
| 542 | RDGB DIARY FOR WEEK 4-8 JUNE 1956 | View |
| 543 | RDGB DIARY ITEMS FOR WEEK ENDING 11 MAY 1956 | View |
| 544 | RDGB DIARY ITEMS FOR WEEK ENDING 23 MARCH 1956 | View |
| 548 | RDGB DIARY ITEMS FOR WEEK ENDING 23 MARCH 1956 | View |
| 545 | RDGB DIARY ITEMS FOR WEEK ENDING 25 MAY 1956 | View |
| 546 | RDGB DIARY ITEMS FOR WEEK ENDING 27 APRIL 1956 | View |
| 547 | RDGB DIARY ITEMS FOR WEEK ENDING 27 JANUARY 1956 | View |
| 549 | RDGB DIARY ITEMS FOR WEEK ENDING 6 APRIL 1956 | View |
| 550 | RECALL OF ADVANCED RECONNAISSANCE SYSTEM FUNDS FROM WRIGHT AIR DEVELOPMENT CENTER | View |
| 551 |
RECOMMENDATIONS CONCERNING THE NATIONAL MANAGEMENT STRUCTURE
FOR MISSILE AND SPACE FLIGHT GROUND DATA EQUIPMENT |
View |
| 552 | RECOMMENDATIONS FOR WS 117L DEVELOPMENT | View |
| 553 | RECONNAISSANCE DATA FROM SAMOS RESEARCH AND DEVELOPMENT | View |
| 554 | RECONNAISSANCE SATELLITE PROGRAM | View |
| 555 | RECONNAISSANCE SATELLITE PROGRAM, MEMO FOR THE SECRETARY OF AF | View |
| 556 | RECONNAISSANCE SATELLITE, MEMO FOR THE SECRETARY OF DEFENSE | View |
| 557 | ONNAISSANCE SATELLITES AND MANNED SPACE EXPLORATION | View |
| 558 | RECORD OF DISCUSSIONS BETWEEN DR. CHARYK, GEN. BUSHY AND COL. MARTIN, 06 OCT 59 | View |
| 559 | RECOVERY PLAN FOR DISCOVERER | View |
| 560 | RECOVERY REQUIREMENTS OF THE AIR FORCE BALLISTIC MISSILE DIVISION | View |
| 561 | REFERENCE TO FUND REQUIREMENTS FOR WEAPON SYSTEM 117L PROGRAM | View |
| 562 | RELEASE OF TECHNICAL DATA TO THE SIGNAL CORPS | View |
| 563 | REORGANIZATION AND REALIGNMENT OF FUNCTIONS OF TECHNICAL OPERATIONS (WDTR) | View |
| 564 | REORGANIZATION OF THE OFFICE OF THE DEPUTY COMMANDER, TECHNICAL OPERATIONS (WDTR) | View |
| 565 | REORGANIZATION, ESTABLISHMENT AND REALIGNMENT OF CERTAIN FUNCTIONS WITHIN WDD | View |
| 566 | REORIENTATION OF 117L PROGRAM MEMO FOR DIRECTOR, DEPUTY DIRECTOR, AND CHIEF SCIENTIST, ARPA | View |
| 567 | REPORT CHANGE RECORD FOR LMSD-445160-B, SAMOS PROGRAM, PART B | View |
| 568 | REPORT OF TRIP 28-30 AUGUST 1956 | View |
| 569 | REPORT OF TRIP TO HEADQUARTERS UNITED STATES AIR FORCE (USAF) 27-30 NOVEMBER 1956 | View |
| 570 | REPORT ON AGENA D CONTRACT STATUS | View |
| 571 |
REPORT ON ATLAS/AGENA LAUNCH OPERATIONS - ATLANTIC MISSILE
RANGE (AMR) VERSUS PACIFIC MISSILE RANGE (PMR) |
View |
| 572 | REPORT ON GEOPHYSICAL DISCUSSIONS WITH AF CAMBRIDGE RESOURCE CENTER (AFCRC) 5-9 NOV 1956 | View |
| 573 |
REQUEST BY HOUSE COMMITTEE ON SCIENCE AND ASTRONAUTS FOR
INFORMATION ON BRIEFING HELD AT AFBMD - SUMMARY OF AFBMD PRESENTATION TO INDUSTRY |
View |
| 574 | REQUEST COPIES OF ANY DIRECTIVES ISSUED BY THE DEPARTMENT OF DEFENSE OR THE MILITARY SERVICE | View |
| 575 |
REQUEST FOR ACCESS TO JET PROPULSION LABORATORY (JPL)
EXPLORER DESIGN INFORMATION AND FLIGHT TEST DATA |
View |
| 576 |
REQUEST FOR APPROVAL OF BRIEFING TO OUTLINE TECHNICAL AND
SYSTEM AREAS OF BOTH PROBLEMS AND ADVANCES |
View |
| 577 |
REQUEST FOR ASSISTANCE FOR JACK CARTER IN THE COORDINATION
AND DIRECTION OF THE OVER-ALL PROJECT EFFORT |
View |
| 578 | REQUEST FOR BRIEFING ON THE ADVANCED RECONNAISSANCE SYSTEM | View |
| 579 | REQUEST FOR COMMENTS ON THE EFFECTS OF REDUCTION IN FUND AVAILABILITY | View |
| 580 | REQUEST FOR COMPREHENSIVE BRIEFING OF THE DISCOVERER RECOVERY PROGRAM | View |
| 581 | REQUEST FOR INFORMATION FROM ALFRED ROCKEFELLER, JR. TO COLONEL AYRES | View |
| 582 | REQUEST FOR PROPOSAL, PR 56-WDDO-196 LOCKHEED AIRCRAFT COMPANY | View |
| 583 | REQUEST FOR SECURITY INVESTIGATION IN REGARD TO MAGAZINE RELEASE | View |
| 584 | NEWS RELEASE, AFSCF FUNCTION CONSOLIDATION | View |
| 585 | REQUEST FOR TWO 117L BRIEFINGS | View |
| 586 |
REQUEST THAT MONEY ON O/A 620-56-5 BE REDUCED TO ZERO, AND
FUNDS RETURNED TO WESTERN DEVELOPMENT DIVISION |
View |
| 587 | REQUEST TO ARRANGE A MEETING TO DISCUSS REACTIONS TO THE FINDINGS ON THE MANAGEMENT SURVEY REPORT | View |
| 588 | REQUEST TO DISCUSS WS 117L POWER REQUIREMENTS | View |
| 589 | REQUEST TO NOTIFY THE SEC/AF OF ROUTINE CONTRACT AUDITS AT LOCKHEED RE WS 117L PROGRAM | View |
| 590 | REQUEST TO PROCEED ON BEHALF OF THE ARPA ARPA ORDER NO. 38-59 | View |
| 591 |
REQUEST TO QUESTIONS RE PARTICIPATION IN THE MISSILE
PROGRAM, FROM THE PREPAREDNESS SUBCOMMITTEE OF THE SENATE ARMED SERVICES COMMITTEE |
View |
| 592 | REQUEST TO RE-ADDRESS THE RESEARCH PROPOSALS FOR COMPUTER ACTIVITY | View |
| 593 | REQUIREMENT FOR SATELLITE TRAINING PROGRAM | View |
| 594 | RESEARCH AND DEVELOPMENT IN THE UNITED STATES AIR FORCE PART B | View |
| 595 | RESEARCH AND DEVELOPMENT OF GUIDED MISSILES AND SPACE VEHICLES OVER THE TIME PERIOD 1955-1975 | View |
| 596 | RESPONSIBILITIES FOR SATELLITE AND SPACE VEHICLE PROGRAMS, 10/12/1959 | View |
| 597 | RESPONSIBILITIES FOR SATELLITE AND SPACE VEHICLE PROGRAMS, 9/25/1959 | View |
| 598 | RESPONSIBILITY FOR ADVANCED RECONNAISSANCE SYSTEM | View |
| 599 | RESULTS OF CONFERENCE AND BRIEFING ON 10, 11 AND 12 NOVEMBER | View |
| 600 | RESULTS OF THE STUDY OF THE USE OF 65-1 LAUNCHES FOR 117L LAUNCHES | View |
| 601 | REVIEW OF THE CHANGES BEING MADE IN THE CHARACTER AND SCOPE OF THE TECHNICAL PROGRAM | View |
| 602 | REVISED ACTION SCHEDULE WS-117L, CO/ARDC | View |
| 603 | REVISED LIST OF DATES FOR 20/10 THOR D | View |
| 604 |
REVISION OF PROCEDURES FOR PREPARATION OF REPORTS ON
PROGRESS OF WORK PERFORMED, ARPA ORDER NO. 9- 50 |
View |
| 605 | REVISION OF THE WS 117L PROGRAM | View |
| 606 | REVISION TO FY 1962 FINANCIAL PLAN | View |
| 607 | SAFUS PRESENTATION TO THE NATIONAL SECURITY COUNCIL | View |
| 608 | SAMOS - AIR RESEARCH AND DEVELOPMENT COMMAND SAMOS R&D PROGRAM | View |
| 609 | SAMOS - AF TO EXPEDITE AND DEVELOP PRE-OPERATIONAL PHOTO POTENTIAL OF PROJECT SAMOS | View |
| 610 | SAMOS - AMEND 2 TO REQUEST FOR PROPOSAL 04-647-61-103 SAMOS E-6 VERSION | View |
| 611 | SAMOS - ARDC SAMOS R&D PROGRAM | View |
| 612 | SAMOS - ATLAS/AGENA, SAMOS DEVELOPMENT PLAN REVISIONS | View |
| 613 | SAMOS - ATTENDANCE LIST FOR JULY 8 MEETING | View |
| 614 | SAMOS - BASIC POLICY | View |
| 615 | SAMOS - BRIEFING ON METEOROLOGICAL SUPPORT FOR THE SAMOS SATELLITE SYSTEM PRESENTED TO AFBMD | View |
| 616 |
SAMOS - CHANGES IN CHARACTER AND SCOPE OF SAMOS PROJECT,
ORGANIZATION AND FUNCTIONS OF THE OFFICE OF MISSILE AND SATELLITE SYSTEMS, SATELLITE RECONNAISSANCE TECHNICAL ADVISORY COUNCIL |
View |
| 617 | SAMOS - CIA STL PARTICIPATION IN THE SAMOS PROGRAM, SAMOS MANAGEMENT | View |
| 618 | SAMOS - COMMUNICATIONS TO SUPPORT SAMOS SATELLITE SYSTEM | View |
| 619 | SAMOS - CONCERN ABOUT THE LACK OF PROGRESS IN THE SAMOS DEVELOPMENT PROGRAM | View |
| 620 |
SAMOS - CONCERN OVER CAPABILITY TO HANDLE INTELLIGENCE DATA
THAT MAY BE OBTAINED FROM THE SAMOS RESEARCH AND DEVELOPMENT FLIGHTS |
View |
| 621 | SAMOS - CONSTRUCTION DELAY, SAMOS PROGRAM, VANDENBERG AIR FORCE BASE, CALIFORNIA | View |
| 622 | SAMOS - DEFINITION OF THE SAMOS PROGRAM | View |
| 623 | SAMOS - EXPANSION OF SAMOS PROGRAM | View |
| 624 | SAMOS - EXPLOITATION OF INITIAL SAMOS DATA | View |
| 625 | SAMOS - EXPLOITATION OF INITIAL SAMOS DATA | View |
| 626 |
SAMOS - MEMO TO GEN SCHRIEVER: ARDC, USAF OPERATIONAL ORDER
FOR SATELLITE AND MISSILE OBSERVATION SYSTEM (SAMOS) SERIAL NO. 60-1 |
View |
| 627 | SAMOS - MIDAS: AFBM COMMITTEE BRIEFED ON A SAMOS AND MIDAS TO PERMIT AN OPERATIONAL DATE OF 1 JULY 62 | View |
| 628 | SAMOS - NSC BRIEFING, NATIONAL SATELLITE RECONNAISSANCE PROGRAM, PHOTOGRAPHIC ELECTRONIC | View |
| 629 | SAMOS "EARLY FIX" FACILITY AT OMAHA | View |
| 630 | SAMOS (SENTRY) PROGRAM IMPACT REPORT | View |
| 631 | SAMOS 12 JULY 60 SAMOS DEVELOPMENT PLAN WAS APPROVED FOR PRESENTATION TO DDR&E | View |
| 632 | SAMOS AF REVISED SAMOS DEVELOPMENT OPERATION PLAN | View |
| 633 | SAMOS AFBMD REVISED DEVELOPMENT PLAN, PRESENTATION SUMMARY | View |
| 634 |
SAMOS AND DISCOVERER PRIORITY ON MATTERS OF TRAINING,
AIRCRAFT MODIFICATION, AND SUPPORT TO THE 6593RD TEST SQUADRON IN SUPPORT OF DISCOVERER AND SAMOS |
View |
| 635 | SAMOS AND MIDAS DEVELOPMENT PROGRAMS | View |
| 636 | SAMOS AND MIDAS PLANS, AFDDC, ARDC | View |
| 637 | SAMOS AND MIDAS TO DCS/D FROM AFCIN | View |
| 638 | SAMOS AND MIDAS, FROM: AFCIN TO DCS/D | View |
| 639 | SAMOS AND MIDAS, REF: LETTER FROM GENERAL POWER TO GENERAL WHITE | View |
| 640 | SAMOS ANNUAL PROGRESS REPORT | View |
| 641 | SAMOS BACKGROUND | View |
| 642 | SAMOS BASIC POLICY CONCERNING SAMOS | View |
| 643 | SAMOS BASIC POLICY CONCERNING SAMOS PART B | View |
| 644 | SAMOS BRIEFING, SAMOS DEVELOPMENT PROGRAM INITIAL SAMOS DATA | View |
| 645 | SAMOS CARTOGRAPHIC MISSION | View |
| 646 | SAMOS -CIA RQMTS TO EXPLOIT RECON DATA FROM THE SAMOS R&D FLIGHT PROGRAM | View |
| 647 | SAMOS COMMAND RELATIONSHIPS | View |
| 648 | SAMOS CONTINGENCY PLAN CORONA, MEMO FOR MR. GILPATRIC | View |
| 649 | SAMOS COSTS AND EXPENDITURES, FY 1960 | View |
| 650 | SAMOS DISCOVERER - APPROVAL FOR QUICK FIX FACILITY AT OFFUTT AFB TO SUPPORT SAMOS AND DISCOVERER | View |
| 651 |
SAMOS DISCOVERER MIDAS - APPROVAL OF ESSENTIAL R&D PROGRAM;
PROGRAM FUNDING FOR FY60 BY WEAPON SYSTEM |
View |
| 652 | SAMOS DISCOVERER MIDAS STATUS REPORT | View |
| 653 | SAMOS DISCOVERER MIDAS FUNDS REQUESTED FOR OCTOBER 1959 WORK ON DISCOVERER, MIDAS AND SAMOS | View |
| 654 | SAMOS DISCOVERER MIDAS METHOD OF FUNDING FOR DISCOVERER, SAMOS, AND MIDAS EFFORTS | View |
| 655 |
SAMOS DISCOVERER MIDAS REVISED PLANS FOR DISCOVERER, SAMOS
AND MIDAS; REQUEST REVIEW OF ARMY AND NAVY REQUIREMENTS |
View |
| 656 |
SAMOS DISCOVERER MIDAS SECOND GENERATION AREA SURVEILLANCE
SATELLITE DATA SATELLITE SYSTEMS; AFBMD ACTIVITIES IN SPACE FOR JUNE 1960 AND AUGUST 1960; DISCOVERER SAMOS MIDAS COMMUNICATIONS SATELLITE |
View |
| 657 | SAMOS FUNDING STATUS, FISCAL YEAR 1961 | View |
| 658 | SAMOS FUNDS PRESENTATION | View |
| 659 |
SAMOS GENERAL OPERATIONAL CONCEPT, AIR FORCE TASKS TO
ACHIEVE NATIONAL INTELLIGENCE OBJECTIVES FROM SAMOS |
View |
| 660 | SAMOS HISTORICAL CHRONOLOGY, 1 JANUARY - 30 JUNE 1961 | View |
| 661 | SAMOS HISTORICAL EVALUATION OF SAMOS | View |
| 662 | SAMOS II FACT SHEET 1/10/61 | View |
| 663 | SAMOS II FACT SHEET 12/31/61 | View |
| 664 | SAMOS INTELLIGENCE DATA PROCESSING CAPABILITY | View |
| 665 | SAMOS INTELLIGENCE REQUIREMENTS FOR SATELLITE RECONNAISSANCE SYSTEMS OF WHICH SAMOS IS AN EXAMPLE | View |
| 666 | SAMOS INTELLIGENCE SYSTEM | View |
| 667 | SAMOS INTELLIGENCE SYSTEM SAMOS, MEMORANDUM FOR THE SECRETARY OF THE AIR FORCE | View |
| 668 | SAMOS INTERSTATION COMMUNICATION REQUIREMENTS FOR SAMOS SYSTEM | View |
| 669 |
SAMOS LAUNCH REPORT, MEMORANDUM FOR THE SECRETARY OF
DEFENSE, ATTENTION: BRIG GEN GEORGE S. BROWN |
View |
| 670 | SAMOS LOCKHEED MISSILES AND SPACE DIVISION (MSD) SATELLITE SYSTEMS BRIEFING, PART II, THE SAMOS PROGRAM | View |
| 671 | SAMOS MANAGEMENT GUIDANCE FROM GENERAL WILSON | View |
| 672 | SAMOS MEETING TO DISCUSS SUBSYSTEM F ASPECTS OF SAMOS PROJECT | View |
| 673 | SAMOS MEMORANDUM REGARDING DEVELOPMENT PLANS FOR SAMOS PROJECT | View |
| 674 | SAMOS METEOROLOGICAL REQUIREMENT FOR SAMOS SATELLITE SYSTEM | View |
| 675 | SAMOS METEOROLOGICAL REQUIREMENTS FOR SAMOS SATELLITE SYSTEM | View |
| 676 | SAMOS MIDAS AND DISCOVERER BUDGET NOTES | View |
| 677 | SAMOS MIDAS FISCAL YEAR 1960 FACILITY PROGRAM FOR SAMOS AND MIDAS | View |
| 678 | SAMOS MIDAS MSG, AIR FORCE BALLISTIC MISSILE COMMITTEE ON A SAMOS AND MIDAS PROGRAM | View |
| 679 | SAMOS MIDAS MSG, SAMOS AND MIDAS, TO DCS/D FROM AFCIN | View |
| 680 | SAMOS MIDAS PRELIMINARY OPERATIONS PLANS FOR SAMOS AND MIDAS | View |
| 681 | SAMOS MINUTES OF JOINT MEETING OF RECONNAISSANCE PANEL AND SAMOS WORKING GROUP, 1 JUL 60 | View |
| 682 | SAMOS MODIFICATION TO BOMBER PLANT FOR THE SAMOS PROGRAM | View |
| 683 | SAMOS NEED TO OBTAIN R&D INFORMATION RE THE SAMOS PROGRAM | View |
| 684 | SAMOS OPERATION IMPLICATIONS | View |
| 685 |
SAMOS OPERATIONS COORDINATING BOARD MEMORANDUM FOR THE
EXECUTIVE OFFICE 4 - U.S. POSITION PAPER ON THE SAMOS PROGRAM |
View |
| 686 | SAMOS PRELIMINARY OPERATIONS PLAN | View |
| 687 |
SAMOS PRESENTATION TO AF WEAPONS BOARD OF AF BALLISTIC
MISSILE COMMITTEE ON SPACE MATTERS: EXPLOITATION OF INITIAL SAMOS DATA |
View |
| 688 | SAMOS PROGRAM 9/14/59 | View |
| 689 | SAMOS PROGRAM 9/28/60 | View |
| 690 | SAMOS PROGRAM COSTS | View |
| 691 | SAMOS PROGRAM PRESENTATION TO THE NATIONAL SECURITY COUNCIL, SUBSYSTEM 1 TEST PLAN | View |
| 692 | SAMOS PROGRAM PROGRESS REPORT | View |
| 693 | SAMOS PROGRAM PROGRESS REPORT, MONTH ENDING 30 SEPTEMBER 60 | View |
| 694 | SAMOS PROGRAMS | View |
| 695 | SAMOS PROJECT ORGANIZATIONAL CHART | View |
| 696 | SAMOS READOUT PROGRAM, SAMOS RECOVERY PROGRAM, MIDAS DEVELOPMENT PLAN | View |
| 697 | SAMOS RECOMMENDATIONS BY DDR&E 14 JUL 60 ON RECON PROJECT SAMOS | View |
| 698 |
SAMOS RECON SATELLITE TEST RECOMMENDATIONS; EXPLOITATION OF
INITIAL SAMOS DATA; SUPPLEMENTAL AF GUIDANCE TO ARDC, STRATEGIC AIR COMMAND, AND ADC CONCERNING SAMOS |
View |
| 699 | SAMOS RECONNAISSANCE DATA FROM SAMOS RESEARCH AND DEVELOPMENT | View |
| 700 | SAMOS REORGANIZATION OF SPACE PROGRAMS | View |
| 701 | SAMOS REPORT OF COMMITTEE TO INVESTIGATE LAUNCH SCHEDULING STATUS - 19 FEB 1959 | View |
| 702 | SAMOS REQUEST FOR SIGNATURE ON MEMO FOR THE CHIEF OF STAFF CONCERNING PLANS FOR SAMOS | View |
| 703 | SAMOS REQUEST TO PREPARE A PLAN FOR THE PRE-OPERATIONAL PHOTOGRAPHIC POTENTIAL OF PROJECT SAMOS | View |
| 704 | SAMOS RESEARCH AND DEVELOPMENT OPERATIONAL PLANS | View |
| 705 | SAMOS REVIEW AND RECOMMENDATIONS OF USAF SATELLITE RECONNAISSANCE PROJECT SAMOS | View |
| 706 | SAMOS REVISED DEVELOPMENT PLAN, SAMOS EXPLOITATION | View |
| 707 | SAMOS REVISED SAMOS DEVELOPMENT PLAN | View |
| 708 | SAMOS REVISED SAMOS DEVELOPMENT PLAN AND SAMOS OPERATIONS | View |
| 709 | SAMOS SAFUS CONCURS WITH PROPOSED TIME SCHEDULE FOR E-6 CONFIGURATION OF SAMOS | View |
| 710 | SAMOS SATELLITE SYSTEM PART B | View |
| 711 | SAMOS SCHEDULE | View |
| 712 | SAMOS SECRETARY OF THE AIR FORCE ORDER - THE DIRECTOR OF THE SAMOS PROJECT, RCC: 116.1 | View |
| 713 |
SAMOS SECTION II, FUNDING PROGRAM, AMENDMENT 1, APPENDIX A,
SPACE SYSTEM DEVELOPMENT PLAN, SAMOS R&D PROGRAM |
View |
| 714 | SAMOS SECURITY GUIDANCE OF AN UNCLASSIFIED NATURE RELATING TO SAMOS | View |
| 715 | SAMOS SENTRY - CHRONOLOGY OF SENTRY AND SAMOS PROGRAMS 2 MARCH 1959 TO DECEMBER 1960 | View |
| 716 | SAMOS SOME CONSIDERATIONS OF THE WEATHER FACTOR IN THE SAMOS PROGRAM | View |
| 717 | SAMOS SPACE SYSTEM DEVELOPMENT PLAN SAMOS DEVELOPMENT/OPERATIONAL PLAN | View |
| 718 | SAMOS SPACE SYSTEM DEVELOPMENT PLAN, SAMOS R&D PROGRAM | View |
| 719 | SAMOS SPACE SYSTEMS DIVISION PRESENTATION ON AGENA D | View |
| 720 | SAMOS SPECIAL SATELLITE RECONNAISSANCE SYSTEM | View |
| 721 | SAMOS STAFF STUDY OF THE SAMOS SYSTEM DESIGN | View |
| 722 | SAMOS STATUS OF SAMOS AND MIDAS DEVELOPMENT PLANS | View |
| 723 |
SAMOS STATUS OF SAMOS, MIDAS, AND DISCOVERER, DEFENSE
COMMUNICATIONS SYSTEM DIRECTOR PROPOSED PROGRAM |
View |
| 724 | SAMOS STATUS REPORT 3/1/1960 | View |
| 725 | SAMOS STL RESPONSIBILITIES IN THE 117L PROGRAM | View |
| 726 | SAMOS SUMMARY OF SAMOS FUNDING SITUATION | View |
| 727 | SAMOS SUPPLEMENTAL HQ USAF GUIDANCE TO ARDC, SAC AND ADC CONCERNING SAMOS | View |
| 728 | SAMOS THE INTELLIGENCE COLLECTED BY 1116-1 | View |
| 729 | SAMOS THE PROBLEM - TO GET THE SAMOS PROGRAM OFF DEAD CENTER | View |
| 730 | SAMOS TRANSFER OF THE SAMOS DEVELOPMENT PROGRAM TO THE DEPT OF THE AIR FORCE | View |
| 731 |
SAMOS TRANSMITTAL OF INTELLIGENCE REQUIREMENTS FOR SATELLITE
RECONNAISSANCE SYSTEMS OF WHICH SAMOS IS AN EXAMPLE |
View |
| 732 | SAMOS USAF INSPECTOR GENERAL SURVEY OF SAMOS SYSTEM, 10 APRIL TO 31 MAY 1961 | View |
| 733 | SAMOS, A NATIONAL SATELLITE RECONNAISSANCE SYSTEM, PHOTOGRAPHIC, ELECTRONIC, NSC BRIEFING | View |
| 734 | SAMOS, GEN LEMAY, GENERAL WHITE, SECRETARY CHARYK, FROM AFCCS | View |
| 735 | SAMOS, MIDAS & DISCOVERER R&D PROGRAMS AND PLANS FOR SAMOS AND MIDAS PROGRAMS 3/17/60 | View |
| 736 |
SAMOS, MIDAS AND DISCOVERER R&D PROGRAMS AND
DEVELOPMENT/OPERATIONAL PLANS FOR SAMOS AND MIDAS PROGRAM 4/20/60 |
View |
| 737 | SAMOS, MIDAS, AND DISCOVERER DEVELOPMENT PROGRAM APPROVAL | View |
| 738 |
SAMOS, MIDAS, AND DISCOVERER R&D PROGRAMS AND
DEVELOPMENT/OPERATIONAL PLANS FOR SAMOS AND MIDAS 5/14/60 |
View |
| 739 | SAMOS, RECOMMENDATION OF PROPOSAL OF GENERAL POWER OF SAMOS REVIEW TO NATIONAL SECURITY COUNCIL | View |
| 740 | SAMOS, UNDERSECRETARY/AF DELEGATED RESPONSIBILITY FOR THE SAMOS PROJECT | View |
| 741 | SAMOS/MIDAS FLIGHT TERMINATION SUBSYSTEM PACIFIC MISSILE RANGE REPORT NUMBER AE70-0769 | View |
| 742 |
SAMOS: 12 JULY DEVELOPMENT PLAN APPROVED FOR PRESENTATION TO
DDR&E WITH CHANGE TO REQUIRE A TOTAL OF TWO NEW ATLAS LAUNCH PADS 9 |
View |
| 743 | SAMOS-INTERSTATION COMMUNICATIONS REQUIREMENTS FOR SAMOS SYSTEM | View |
| 744 |
SAMOS-MIDAS-DISCOVERER TRANSFER OF DISCOVERER, SAMOS AND
MIDAS DEVELOPMENT PLANS, FROM WDZP TO HQ USAF (AFDAT) 1/30/60 |
View |
| 745 | SAMOS-MIDAS-DISCOVERER TRANSFER OF FUNCTIONAL RESPONSIBILITY FOR ARS PROGRAM | View |
| 746 |
SAMOS-MIDAS-DISCOVERER TRANSFER OF RESPONSIBILITY OF THE
PROGRAM TO THE AIR FORCE, ARPA ORDER NO. 119-60 |
View |
| 747 |
SAMOS-MIDAS-DISCOVERER TRANSFER OF THE SAMOS, MIDAS AND
DISCOVERER DEVELOPMENT PROGRAMS TO THE DEPARTMENT OF THE AIR FORCE 2/18/60 |
View |
| 748 |
SAMOS-MIDAS-DISCOVERER TRANSFER OF THE SPACE AND MISSILE
ORGANIZATION SYSTEM DEVELOPMENT PROGRAM TO THE DEPARTMENT OF THE AIR FORCE 11/17/59 |
View |
| 749 | SANTA CRUZ TEST BASE BRIEFING BY AGENA DIVISION | View |
| 750 | SATELLITE AND SPACE SYSTEMS HISTORY | View |
| 751 | SATELLITE DEVELOPMENT PLAN | View |
| 752 | SATELLITE PLANS OF THE MILITARY DEPARTMENTS D/GM CONT. NO. 130-58 | View |
| 753 | SATELLITE SYSTEMS - SENTRY PROGRAM MISSION | View |
| 754 | SATELLITE SYSTEMS DATA BOOK DISCOVERER PROGRAM PART B | View |
| 755 | SATELLITE TO GROUND ENCRYPTION FROM AFOAC-S/O TO AFDRD-ER | View |
| 756 | SATELLITE TRACKING STATIONS IN THE HAWAIIAN AREA | View |
| 757 | SECRETARY OF USAF: REQUEST TO CONTINUE WITH PROJECT DISCOVERER-THOR PROJECT | View |
| 758 | SECURITY AND PUBLIC RELEASE OF INFORMATION REGARDING USAF SATELLITE PROGRAM | View |
| 759 | SECURITY CLASSIFICATION OF NAMES AND NUMBERS USED TO DESIGNATE WS 117L, ARS | View |
| 760 | SECURITY CONSIDERATION REGARDING WS 117L IN RELATION TO RAMO-WOOLDRIDGE CORPORATION | View |
| 761 | SECURITY CONSIDERATIONS RELEVANT TO WEAPON SYSTEM 117L | View |
| 762 | SECURITY GUIDANCE OF AN UNCLASSIFIED NATURE RELATING TO SPACE AND MISSILE ORGANIZATION SYSTEM | View |
| 763 | SECURITY MARKING #369940 PART B | View |
| 764 | SECURITY OF WEAPON SYSTEM FUNDING INFORMATION | View |
| 765 |
SENTRY - ASSIGNMENT OF OPS PLANNING RESPONSIBILITY AND
SECURITY CLASSIFICATION FOR SENTRY PROGRAM ESTABLISHED |
View |
| 766 |
SENTRY - CHIEF OF NAVAL OPERATIONS (CNO) ADVISES FLEET
PARTICIPATION IN SENTRY RECOVERY OPERATIONS BE TERMINATED |
View |
| 767 | SENTRY - CONSTRUCTION OF A LAUNCH COMPLEX IN SUPPORT OF THE SENTRY PROGRAM, ARPA ORDER NO. 41-59 | View |
| 768 | SENTRY - FUNDING POLICY FOR SENTRY PROGRAM | View |
| 769 |
SENTRY - HEADQUARTERS AIR RESEARCH AND DEVELOPMENT COMMAND,
SENTRY SPACE SYSTEM DEVELOPMENT PLAN; K243.8636-43V.2 |
View |
| 770 | SENTRY DEVELOPMENT CONTROL CENTER | View |
| 771 | SENTRY DEVELOPMENT PROGRAM | View |
| 772 |
SENTRY DEVELOPMENT PROGRAM APPROVED TO EXTENT IT PERTAINS TO
PAYLOAD PROGRAMS OF VISUAL RECONNAISSANCE READOUT, VISUAL RECONNAISSANCE RECOVERY, AND FERRET READOUT |
View |
| 773 | SENTRY DEVELOPMENT PROGRAM IS APPROVED TO EXTENT IT PERTAINS TO PAYLOAD PROGRAMS | View |
| 774 |
SENTRY ESTABLISHMENT OF ARPA AD HOC GROUP TO INVESTIGATE,
EVALUATE, AND RECOMMEND AN ARPA SENTRY AND FOLLOW ON PROGRAM |
View |
| 775 | SENTRY LMSD PROPOSAL OF 15 MAY 1959 FOR THE SENTRY PROGRAM | View |
| 776 | SENTRY LOCATION OF THE MISSILE ASSEMBLY BUILDING FOR THE SENTRY PROGRAM | View |
| 777 | SENTRY MEETING ON THE SENTRY ASSEMBLY BUILDING PROBLEM | View |
| 778 | SENTRY MESSAGE REGARDING SENTRY PROGRAM REDESIGNATED SAMOS | View |
| 779 | SENTRY OPERATIONAL ANNEX 'A' TO SENTRY DEVELOPMENT PLAN | View |
| 780 | SENTRY PROGRAM PROGRESS REPORT FOR THE MONTH OF JULY 1959 | View |
| 781 | SENTRY REORIENTATION OF SENTRY PROGRAM | View |
| 782 | SMAMA HISTORICAL STUDY #35, SMAMA SUPPORT OF WS-117L 1959 | View |
| 783 | SOLVING COMPLEX CAMERA AND STABILIZATION PROBLEMS | View |
| 784 | SPACE AND MISSILE ORGANIZATION SYSTEM - BASIC POLICY HQS. OFFICE INSTRUCTION NO. 25-5 | View |
| 785 | SPACE AND MISSILE ORGANIZATION SYSTEM AND MISSILE DETECTION ALARM SYSTEM DEVELOPMENT PROGRAM | View |
| 786 | SPACE AND MISSILE ORGANIZATION SYSTEM BASIC POLICY MEMO FOR THE CHIEF OF STAFF | View |
| 787 | SPACE FLIGHT PROGRAM, MEMORANDUM TO COL ELY | View |
| 788 | SPACE VEHICLE SUPPLEMENT TO THE ELINT STUDY | View |
| 789 | SPECIAL ORDERS NUMBER 6 EVALUATION BOARD OF THE WS-117L PROJECT | View |
| 790 | SPECIAL ORDERS NUMBER M-874 ESTABLISHMENT OF MANAGEMENT SURVEY TEAM | View |
| 791 | SPECIAL ORDERS NUMBER M-987 HARDWARE ACCEPTANCE TEAM | View |
| 792 | STAFF MESSAGE AND MEMORANDUMS: ACCELERATION OF WS-117L SECRET | View |
| 793 | STAFF MESSAGE REGARDING DEVELOPMENT PLAN | View |
| 794 | STAFF MESSAGE REGARDING POINT ARGUELLO LAUNCH | View |
| 795 | STAFF MESSAGE REGARDING PROTECTION FOR THE SYSTEM TRANSMISSIONS | View |
| 796 | STAFF MESSAGE REGARDING SYSTEM DEVELOPMENT PLAN BEING REVISED | View |
| 797 |
STANDARDIZATION OF AGENA B - A PRESENTATION OF THE CASE FOR
STANDARDIZATION INCLUDING CONTRACTUAL ASPECTS |
View |
| 798 | STATE DEPARTMENT QUERY ON RECONNAISSANCE SATELLITES | View |
| 799 | STATEMENT OF WORK (STUDY OF GUIDANCE FACILITIES) | View |
| 800 | STATUS OF ADVANCED RECONNAISSANCE SYSTEM - AIR FORCE ROCKET ENGINE SUMMARY | View |
| 801 | STATUS OF ADVANCED RECONNAISSANCE SYSTEM (ARS) EARLY CAPABILITY | View |
| 802 | STATUS OF REVIEW OF STATEMENT OF WORK FOR SPACE TECHNOLOGY LAB (STL) AT COOKE | View |
| 803 | SUB-CONTRACT DIFFICULTIES WITH MASSACHUSETTS INSTITUTE OF TECHNOLOGY (MIT) | View |
| 804 |
SUBMISSION OF ITEMS FOR OFFICE OF SECRETARY OF DEFENSE
BALLISTIC MISSILE COMMITTEE (OSD-BMC) CONSIDERATION |
View |
| 805 | SUBSYSTEM AND PHOTOGRAPHIC SYSTEM PERFORMANCE | View |
| 806 | SUMMARY DESCRIPTION OF BALLISTIC MISSILE CONTRACTS BY 117L WEAPON SYSTEM - ARS, AS OF 31 MARCH 1958 | View |
| 807 | SUMMARY OF AIR FORCE BALLISTIC MISSILE DIVISION ACTIVITIES IN SPACE APRIL 1960 | View |
| 808 | SUMMARY OF AIR FORCE BALLISTIC MISSILE DIVISION ACTIVITIES IN SPACE AUGUST 1960 | View |
| 809 | SUMMARY OF AIR FORCE BALLISTIC MISSILE DIVISION ACTIVITIES IN SPACE DECEMBER 1959 - JANUARY 1960 | View |
| 810 | SUMMARY OF AIR FORCE BALLISTIC MISSILE DIVISION ACTIVITIES IN SPACE DECEMBER 1960 | View |
| 811 | SUMMARY OF AIR FORCE BALLISTIC MISSILE DIVISION ACTIVITIES IN SPACE FEBRUARY 1960 | View |
| 812 | SUMMARY OF AIR FORCE BALLISTIC MISSILE DIVISION ACTIVITIES IN SPACE JANUARY 1961 | View |
| 813 | SUMMARY OF AIR FORCE BALLISTIC MISSILE DIVISION ACTIVITIES IN SPACE JULY 1959 | View |
| 814 | SUMMARY OF AIR FORCE BALLISTIC MISSILE DIVISION ACTIVITIES IN SPACE JULY 1960 | View |
| 815 | SUMMARY OF AIR FORCE BALLISTIC MISSILE DIVISION ACTIVITIES IN SPACE JUNE 1960 PART B | View |
| 816 | SUMMARY OF AIR FORCE BALLISTIC MISSILE DIVISION ACTIVITIES IN SPACE MARCH 1960 | View |
| 817 | SUMMARY OF AIR FORCE BALLISTIC MISSILE DIVISION ACTIVITIES IN SPACE MAY 1960 | View |
| 818 | SUMMARY OF AIR FORCE BALLISTIC MISSILE DIVISION ACTIVITIES IN SPACE NOVEMBER 1960 | View |
| 819 | SUMMARY OF AIR FORCE BALLISTIC MISSILE DIVISION ACTIVITIES IN SPACE OCTOBER 1960 | View |
| 820 | SUMMARY OF AIR FORCE BALLISTIC MISSILE DIVISION ACTIVITIES IN SPACE SEPTEMBER 1960 | View |
| 821 | SUMMARY OF PERSONNEL PROCUREMENT, MEMO FOR GEN POWER | View |
| 822 | SUMMARY OF THE ADVANCED RECONNAISSANCE SYSTEM DEVELOPMENT | View |
| 823 | SYSTEM 609A | View |
| 824 | TECHNICAL PROPOSAL FOR RECOVERABLE RECONNAISSANCE SYSTEM | View |
| 825 |
TELEPHONE CONVERSATION BETWEEN COLONEL NORTON AND COLONEL
EICHEL, AFMTC, REGARDING THE 117L PROGRAM |
View |
| 826 | TELEPHONE CONVERSATION WITH NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) PERSONNEL | View |
| 827 | TELEPHONE INTERVIEW WITH GLEN FOREST MCCARTNEY (USAF-RET) INTERVIEWED BY MAJ. DAVID ARNOLD (USAF) | View |
| 828 | TELEPHONE MESSAGE RE BMD PRESENTATION | View |
| 829 | TERMS OF REFERENCE FOR WORKING GROUP ON CERTAIN ASPECTS OF NSC 5520 | View |
| 830 | THE $120,200,000 FY 1959 PHASE I PROGRAM IS APPROVED | View |
| 831 | THOR GROUND SUPPORT EQUIPMENT SECTION 4 | View |
| 832 | THOR IRBM PROGRAM | View |
| 833 |
THOR/TITAN, SAMOS DEVELOPMENT PLAN, SAFUS PLANNING GUIDE,
REVISED DEVELOPMENT PLAN BY DIRECTORS OF DEFENSE RESEARCH AND ENGINEERING, POINT ARGUELLO COMPLEX |
View |
| 834 | THOR-AGENA STORY DRAFT PREPARED BY CLYDE LITTLEFIELD PART B | View |
| 835 | THOR-VANGUARD SATELLITE EXPLOITATION PLAN | View |
| 836 | THOUGHTS ON ORGANIZING TO ACCOMPLISH THE COMMUNICATION SATELLITE JOB | View |
| 837 | THOUGHTS ON THE SAMOS STAFF OFFICE FROM MAJOR HENRY HOWARD, UNITED STATES AIR FORCE | View |
| 838 | THRESHOLD OF SPACE: THE AIR FORCE IN THE NATIONAL SPACE PROGRAM 1945-1959 | View |
| 839 |
TOWARD NEW HORIZONS, SCIENCE, THE KEY TO AIR SUPREMACY, A
REPORT TO GEN OF THE ARMY ARNOLD, SUBMITTED ON BEHALF OF THE A.A.F. SCIENTIFIC ADVISORY GROUP BY TH. VON KARMAN PART B |
View |
| 840 | TRAINING-WITH-INDUSTRY PROGRAM FOR WS 117L SYSTEM OFFICER | View |
| 841 | TRANSMITTAL OF REPORTS, TO: CHIEF OF STAFF, HEADQUARTERS, US AIR FORCE | View |
| 842 | REPORT OF A SPECIAL PANEL ON SATELLITE TRIP REPORT - POSSIBLE LOSS OF DISCOVERER II IN NORWAY | View |
| 843 | TRIP REPORT ON THE PRESENTATION OF WS-117L AT HEADQUARTERS UNITED STATES AIR FORCE (USAF) | View |
| 844 | TWX DATED 6/10/60 FROM AFDDC TO AFDSD - MAY GEN DEMLER | View |
| 845 | TWX, APPROVAL FOR ADVANCE FINANCING OF THE FY 1959 PROGRAM REQUIREMENTS | View |
| 846 | TWX, DISCOVERER BRIEFING TO BE GIVEN TO THE AIR STAFF | View |
| 847 | TWX, ESTABLISHMENT OF SYSTEM PROGRAM OFFICE | View |
| 848 | TWX, INVESTIGATION POSSIBILITIES OUTLINED IN REFERENCED MESSAGE | View |
| 849 | UNITED STATES AND OUTER SPACE REPORT OF THE SELECT COMMITTEE ON ASTRONAUTICS AND SPACE EXPLORATION | View |
| 850 | US BALLISTIC MISSILE AND SPACE CENTER FACILITY PRESENTATION FOR MR. QUARLES | View |
| 851 | USAF PROJECT FORECAST INTELLIGENCE AND RECONNAISSANCE REPORT VOLUME II | View |
| 852 | USAF REQUEST FOR SPACE MISSIONS & SUPPORT OF SPACE PROGRAMS, CHRONOLOGY OF DOCUMENTS | View |
| 853 | USAF SATELLITE TEST CENTER 6594TH TEST WING | View |
| 854 | USAF SPACE PROGRAMS 1945-1962 VOLUME TWO | View |
| 855 |
VANGUARD PARTIAL REPORT, PROPULSION SUBSYSTEM, FLIGHT TEST
PROGRAM DESIGN CRITERIA FOR ALTERNATE LAUNCH SITE JULY-SEPT 1956 |
View |
| 856 | WDD ARDC DEVELOPMENT PLAN WEAPON SYSTEM 117L INITIAL TEST PHASE ADVANCED RECONNAISSANCE SYSTEM | View |
| 857 | WDD CONTROL OF LOCKHEED AIRCRAFT CORPORATION PRESENTATIONS ON WS 117L | View |
| 858 | WDD HQ ARDC DEVELOPMENT PLAN | View |
| 859 |
WDD L56-46 COMMENTS ON "RESEARCH AND DEVELOPMENT OF GUIDED
MISSILES AND SPACE VEHICLES OVER THE TIME PERIOD 1955-1975 |
View |
| 860 | WDD-AFBMD-SSD SPACE PROGRAMS 1954-1966 PART B | View |
| 861 | WEATHER FACTORS IN SATELLITE RECONNAISSANCE | View |
| 862 | WEEKLY DIARY - 1 THROUGH 7 JANUARY 1960 | View |
| 863 | WEEKLY DIARY - 11 THROUGH 17 DECEMBER 1959 | View |
| 864 | WEEKLY DIARY - 12 THROUGH 18 FEBRUARY 1960 | View |
| 865 | WEEKLY DIARY - 13 THROUGH 19 NOVEMBER 1959 | View |
| 866 | WEEKLY DIARY - 15 THROUGH 21 JANUARY 1960 | View |
| 867 | WEEKLY DIARY - 16 THROUGH 22 OCTOBER 1959 | View |
| 868 | WEEKLY DIARY - 19 JANUARY THROUGH 4 FEBRUARY 1960 | View |
| 869 | WEEKLY DIARY - 19 THROUGH 25 FEBRUARY 1960 | View |
| 870 | WEEKLY DIARY - 2 MARCH THROUGH 8 MARCH 1960 | View |
| 871 |
WEEKLY DIARY - 2 THROUGH 9 JANUARY 1958 WS 117L PROGRAM,
DEFINITION OF LETTER CONTRACT, UNUSUALLY HAZARDOUS RISKS CLAUSE, AUGMENTED ACCELERATION PLAN |
View |
| 872 | WEEKLY DIARY - 23 THROUGH 29 OCTOBER 1959 | View |
| 873 | WEEKLY DIARY - 27 NOVEMBER THROUGH 3 DECEMBER 1959 | View |
| 874 | WEEKLY DIARY - 30 OCTOBER THROUGH 5 NOVEMBER 1959 | View |
| 875 | WEEKLY DIARY - 5 THROUGH 11 FEBRUARY 1960 | View |
| 876 | WEEKLY DIARY - 6 THROUGH 12 NOVEMBER 1959 | View |
| 877 | WEEKLY DIARY - 8 THROUGH 14 JANUARY 1960 | View |
| 878 | WEEKLY DIARY 11 SEPTEMBER 1959 THROUGH 17 SEPTEMBER 1959 | View |
| 879 | WEEKLY DIARY 12-18 DECEMBER 1958, WS 117L PROGRAM | View |
| 880 | WEEKLY DIARY 15 OCTOBER 1959 THROUGH 2 OCTOBER 1959 | View |
| 881 | WEEKLY DIARY 16-22 AUGUST 1957, LOCKHEED AIRCRAFT CORPORATION | View |
| 882 | WEEKLY DIARY 17 DECEMBER 1959 THROUGH 31 DECEMBER 1959 | View |
| 883 | WEEKLY DIARY 19 NOVEMBER 1959 THROUGH 2 DECEMBER 1959 | View |
| 884 | WEEKLY DIARY 19-24 DECEMBER 1958, WS 117L PROGRAM | View |
| 885 | WEEKLY DIARY 19-25 JULY 1957, LOCKHEED AIRCRAFT CORPORATION | View |
| 886 | WEEKLY DIARY 2 OCTOBER 1959 THROUGH 8 OCTOBER 1959 | View |
| 887 | WEEKLY DIARY 22 OCTOBER 1959 THROUGH 28 OCTOBER 1959 | View |
| 888 | WEEKLY DIARY 22-28 JANUARY 1959, WS 117L PROGRAM | View |
| 889 | WEEKLY DIARY 25 SEPTEMBER 1959 THROUGH 1 OCTOBER 1959 | View |
| 890 | WEEKLY DIARY 26 FEBRUARY - 4 MARCH 1959, WS 117L PROGRAM | View |
| 891 | WEEKLY DIARY 26 JULY - 1 AUGUST 1957, LOCKHEED AIRCRAFT CORPORATION | View |
| 892 | WEEKLY DIARY 26-31 DECEMBER 1958, WS 117L PROGRAM | View |
| 893 | WEEKLY DIARY 27 MARCH - 2 APRIL 1959, WS 117L PROGRAM | View |
| 894 | WEEKLY DIARY 2-8 AUGUST 1957, LOCKHEED AIRCRAFT CORPORATION | View |
| 895 | SAMOS - BASIC POLICY CONCERNING SAMOS: WEEKLY DIARY 28 AUGUST 1959 THROUGH 3 SEPTEMBER 1959 | View |
| 896 | WEEKLY DIARY 29 OCTOBER 1959 THROUGH 4 NOVEMBER 1959 | View |
| 897 | WEEKLY DIARY 3 DECEMBER 1959 THROUGH 9 DECEMBER 1959 | View |
| 898 | WEEKLY DIARY 9 MARCH THROUGH 16 MARCH 1960 | View |
| 899 | WEEKLY DIARY ITEM | View |
| 900 | WEEKLY DIARY ITEMS - 12 FEB 1959 THROUGH 18 FEB 1959 | View |
| 901 | WEEKLY DIARY ITEMS - LBTI - 19 MARCH 1959 THROUGH 25 MARCH 1959 | View |
| 902 | WEEKLY DIARY ITEMS - LBTP 18 JUNE 59 THRU 24 JUNE 1959 | View |
| 903 | WEEKLY DIARY ITEMS - LBTP, 12 MARCH 1959 THROUGH 18 MARCH 1959 | View |
| 904 | WEEKLY DIARY ITEMS - LBTP, 15 JANUARY 1959 THROUGH 21 JANUARY 1959 | View |
| 905 | WEEKLY DIARY ITEMS - LBTP, 19 FEBRUARY 1959 THROUGH 25 FEBRUARY 1959 | View |
| 906 | WEEKLY DIARY ITEMS - LBTP, 29 JANUARY 1959 THROUGH 4 FEBRUARY 1959 | View |
| 907 | WEEKLY DIARY ITEMS - LBTP, 3 APRIL 1959 THROUGH 9 APRIL 1959 | View |
| 908 | WEEKLY DIARY ITEMS - LBTP, 5 FEBRUARY 1959 THROUGH 11 FEBRUARY 1959 | View |
| 909 | WEEKLY DIARY ITEMS - LBTP, 5 MARCH 1959 THROUGH 11 MARCH 1959 | View |
| 910 | WEEKLY DIARY ITEMS - LBZS, 27 AUGUST THROUGH 2 SEPTEMBER 1959 | View |
| 911 | WEEKLY DIARY ITEMS - LBZSA - 11 FEBRUARY THROUGH 17 FEBRUARY 1960 | View |
| 912 | WEEKLY DIARY ITEMS - LBZSA - 18 FEBRUARY THROUGH 24 FEBRUARY 1960 | View |
| 913 | WEEKLY DIARY ITEMS - LBZSA - 21 JANUARY THROUGH 27 JANUARY 1960 | View |
| 914 | WEEKLY DIARY ITEMS - LBZSA 24 SEPTEMBER 1959 THROUGH 30 SEPTEMBER 1959 | View |
| 915 | WEEKLY DIARY ITEMS - LBZSA 8 OCTOBER 1959 THROUGH 14 OCTOBER 1959 | View |
| 916 | WEEKLY DIARY ITEMS - LBZSA, 10 SEPTEMBER THROUGH 16 SEPTEMBER 1959 | View |
| 917 | WEEKLY DIARY ITEMS - LBZSA, 17 SEPTEMBER 1959 THROUGH 23 SEPTEMBER 1959 | View |
| 918 | WEEKLY DIARY ITEMS - LBZSA, 25 FEBRUARY 1960 THROUGH 2 MARCH 1960 | View |
| 919 | WEEKLY DIARY ITEMS - LBZSA, 3 MARCH THROUGH 8 MARCH 1960 | View |
| 920 | WEEKLY DIARY ITEMS - LBZSA, 4 FEBRUARY THROUGH 10 FEBRUARY 1960 | View |
| 921 | WEEKLY DIARY ITEMS - LBZSA, 7 JANUARY THROUGH 13 JANUARY 1960 | View |
| 922 | WEEKLY DIARY ITEMS - LBZSP, 1 OCTOBER 1959 THROUGH 7 OCTOBER 1959 | View |
| 923 | WEEKLY DIARY ITEMS - LBZSP, 28 JANUARY 1960 THROUGH 3 FEBRUARY 1960 | View |
| 924 | WEEKLY DIARY ITEMS 3 SEPTEMBER THROUGH 9 SEPTEMBER 1959 | View |
| 925 | WEEKLY DIARY, 14 AUGUST - 20 AUGUST 1959, SATELLITE SYSTEMS PROGRAM | View |
| 926 | WEEKLY DIARY, AMC BALLISTIC MISSILES CENTER, US AIR FORCE | View |
| 927 |
WORK STATEMENT FOR MANAGEMENT STRUCTURE OF PROPOSED HOLLOMAN
AIR DEVELOPMENT CENTER (HADC) GUIDED MISSILES AND SPACE VEHICLE CENTER |
View |
| 928 | WS 117 LOCKHEED TO RECEIVE A RFP FROM THE AF FOR DEVELOPMENT OF WS 117L | View |
| 929 | WS 117 NOTES ON WS-117L MANAGEMENT | View |
| 930 | WS 117 OPERATIONAL CONCEPT | View |
| 931 | WS 117 OPERATIONAL REQUIREMENTS AND TECHNICAL APPROACH FOR WS117L VISUAL AND FERRET SUBSYSTEMS | View |
| 932 | WS 117 PLANNING SCHEDULE | View |
| 933 |
WS 117 PREPARING A BRIEFING ON WS 117L TO BE USED IN
CONJUNCTION WITH FORMAL PERIODS OF INSTRUCTION ON BALLISTIC MISSILES |
View |
| 934 | WS 117 PRESENTATION WILL BE MADE AS REQUESTED UNLESS ADVISED TO THE CONTRARY 10/22/1956 | View |
| 935 | WS 117 PRESENTATION 10/17/1956 | View |
| 936 | WS 117 PRESENTATION BY MISSILE SYSTEMS DIVISION | View |
| 937 | WS 117 PRESENTATION TO THE STEWART COMMITTEE | View |
| 938 |
WS 117 PROGRAM DESCRIPTION WS117L ADVANCED RECONNAISSANCE
SYSTEM THOR-DISCOVERER, SENTRY, MIDAS, CARROUSEL |
View |
| 939 | WS 117 PROGRAM SCHEDULE, ACCELERATED PROGRAM ADVANCED RECONNAISSANCE SYSTEM (ARS) WS-117L | View |
| 940 | WS 117 SELECTION OF WS 117L GUIDANCE SCHEME AND/OR CONTRACTOR | View |
| 941 | WS 117 SPECIAL PRESENTATION FOR WS 117L PRIME CONTRACTOR | View |
| 942 | WS 117 STATUS REPORT ON FORMAL DESIGN STUDY EFFORT ON THE ADVANCED RECONNAISSANCE SYSTEM 117L | View |
| 943 | WS 117 SUGGESTED NAMES FOR 117L VEHICLES | View |
| 944 | WS 117 SUMMARY OF FINDINGS OF WS-117L MANAGEMENT PROJECT | View |
| 945 | WS 117 SUMMARY OF SPACE TECHNOLOGY LABORATORY (STL) SUPPORT TO WS 117L JULY 1958-APRIL 1959 | View |
| 946 | WS 117 SUMMARY OF SYSTEM AND MISSILE ORGANIZATION PROGRAM SITUATION | View |
| 947 | WS 117L "SENSITIVE ASPECTS" ROSTER | View |
| 948 | WS 117L ACTIVITIES AT AIR FORCE MISSILE TEST CENTER (AFMTC) MEMO FOR GEN SCHRIEVER | View |
| 949 |
WS 117L ADVANCED SYSTEM DATA PROCESSING FOR SUBSYSTEM
G-MIDAS SATELLITE SYSTEM, CONTRACT AF 04(647)- 97 |
View |
| 950 | WS 117L AF ACCEPTANCE TEAM PROCEDURES AND REQUIREMENTS FOR WS 117L | View |
| 951 | WS 117L ARS, DEVELOPMENT PLAN VOLUME II SUBSYSTEM PLANS, J. GROUND SUPPORT AND TRAINING | View |
| 952 | WS 117L ARS, DEVELOPMENT PLAN, VOLUME II SUBSYSTEM PLANS, B. PROPULSION | View |
| 953 | WS 117L BACKGROUND FROM FALL 1945 TO 10 OCT 1961 CHRONOLOGY | View |
| 954 | WS 117L COMMUNICATIONS & CONTROL SUBSYSTEM ENGINEERING ANALYSIS REPORT DISCOVERER PROGRAM PART A | View |
| 955 | WS 117L DEVELOPMENT PLAN FOR PROGRAM ACCELERATION CONTRACT AF 04(647)-97, PART B | View |
| 956 | WS 117L DISCOVERER, SENTRY AND MIDAS PROGRAM AND FUNDING CHRONOLOGY 1946-1959 | View |
| 957 | WS 117L DISTRIBUTION OF REPORTS | View |
| 958 | WS 117L MANAGEMENT | View |
| 959 | WS 117L MANAGEMENT SURVEY | View |
| 960 | WS 117L MEETING, MEMO FOR THE RECORD | View |
| 961 | WS 117L MEETINGS | View |
| 962 | WS 117L PRESENTATION AT BALLISTIC MISSILE ORIENTATION COURSE | View |
| 963 | WS 117L PRESENTATION, ADVANCED RECONNAISSANCE SYSTEM DOCUMENT HISTORY 1956 | View |
| 964 | WS 117L PRESENTATIONS | View |
| 965 | WS 117L PROCEDURES | View |
| 966 | WS 117L PROGRAM | View |
| 967 | WS 117L PROGRAM AND FUNDING CHRONOLOGY | View |
| 968 | WS 117L PROGRAM PLANNED PROCEDURES TO FINANCE WS 117L WORK | View |
| 969 | WS 117L PROGRAM STATUS REPORT AS OF 15 APRIL 1958, TCS AF-XDD-A2 | View |
| 970 | WS 117L PROGRAM, DESIGN CRITERIA FOR THE LAUNCH FACILITY | View |
| 971 | WS 117L REPORTS | View |
| 972 | WS 117L REQUIREMENTS ON AIR FORCE MISSILE TEST CENTER (AFMTC) | View |
| 973 | WS 117L SOURCE SELECTION BOARD, TO: COMMANDER AIR MATERIEL COMMAND | View |
| 974 |
WS 117L SOURCE SELECTION BOARD, TO: DEPUTY COMMANDER FOR
WEAPONS SYSTEMS HQ AIR RESEARCH AND DEVELOPMENT COMMAND |
View |
| 975 | WS 117L STAFF STUDY - PROPOSED MANAGEMENT PROCEDURE FOR WS 117L | View |
| 976 | WS 117L STATUS OF FUNDS WS-117L PROGRAM | View |
| 977 | WS 117L TRAINING PROGRAMS - MEMO FOR CAPTAIN PENICK | View |
| 978 | WS 117L USAF APPROVED LOCKHEED AIRCRAFT AS WS-117L PRIME SYSTEM CONTRACTOR | View |
| 979 | WS 117L USE OF SM-65A MISSILES IN THE WS 117L FLIGHT TEST PROGRAM | View |
| 980 | WS 117L WORK UNDER CONTRACT NUMBER AF 18 (600) 1190 | View |
| 981 | WS 117L, QUESTIONS POSED BY THE SCIENTIFIC ADVISORY COMMITTEE | View |
| 982 |
WS 117L, SAMOS, DISCOVERER ADVANCED RECONNAISSANCE SYSTEM
(ARS): THE PRIMARY OBJECTIVE OF THE WS-117L PROGRAM |
View |
| 983 |
WS 117L, SAMOS, DISCOVERER OUTLINE OF A DEVELOPMENT PLAN FOR
AN ADVANCED (SATELLITE) RECONNAISSANCE SYSTEM |
View |
| 984 | WS 117L, SAMOS, DISCOVERER RECORDS FROM LA PROGRAMS S-01A REPORT ON AGENA D | View |
| 985 |
WS 117L, SAMOS, DISCOVERER RESEARCH STUDY AND INVESTIGATION
ON TELEVISION TECHNIQUES FOR ADVANCED RECONNAISSANCE SYSTEMS |
View |
| 986 | WS 117L, SAMOS, DISCOVERER, AFBMD OPERATION PLAN 2-59 (659 TEST WING) PART B | View |
| 987 |
WS 117L, SAMOS, DISCOVERER, THE AGENA SATELLITE - WHAT IT
HAS DONE, WHAT IT CAN DO, AGENA, DISCOVERER, MIDAS AND SAMOS |
View |
| 988 | WS 117L: EFFECTS OF SPUTNIK ON WS 117L ARPA'S PERIOD OF MANAGEMENT, DISCOVERER - POST SPUTNIK | View |
| 989 | WS 117SYSTEMS INTEGRATION - 117L | View |
| 990 |
WS-117 PROGRAM (3 COPIES), MEMO FOR SECRETARY OF THE AIR
FORCE, ATTN: THE UNDER SECRETARY OF THE AIR FORCE |
View |
| 991 | WS-117 SENTRY SYLLABUS REPORT | View |
| 992 | WS117 STATUS REPORT AS OF 15 APRIL 1958 | View |
| 993 | WS-117L ARS, DEVELOPMENT PLAN, VOLUME II SUBSYSTEM PLANS, D. GUIDANCE AND CONTROL | View |
| 994 | WS-117L CONTRACTOR BRIEFING, TO: WDTR, FROM: WDTT | View |
| 995 | WS-117L CONTRACTOR SELECTION BOARD 2/17/1956 | View |
| 996 | WS-117L CONTRACTOR SELECTION BOARD, COMMANDER, AIR RESEARCH AND DEVELOPMENT COMMAND | View |
| 997 |
WS-117L CONTRACTOR SELECTION BOARD, TO: COMMANDER AIR
MATERIAL COMMAND WRIGHT-PATTERSON AIR FORCE BASE, OHIO |
View |
| 998 | WS-117L CONTRACTOR SELECTION BOARD, TO: RAMO-WOOLDRIDGE CORPORATION | View |
| 999 | WS117L CONTRACTOR SELECTION, MEMO TO COL TERHUNE | View |
| 1000 | WS117L FLIGHT SCHEDULE, MEMO ON WS117L PRESENTATIONS: MEMO ON WS117L GUIDANCE, WDTR 57-401 | View |
| 1001 | WS-117L FLIGHT SCHEDULE, MEMO FOR COL TERHUNE | View |
| 1002 | WS-117L FUNDING FOR FY 1958, MEMO FOR GEN SCHRIEVER | View |
| 1003 | WS-117L GENERAL BACKGROUND | View |
| 1004 | WS-117L PLANNING | View |
| 1005 | WS-117L PROGRAM | View |
| 1006 | WS117L REPORTS | View |
| 1007 | WS117L SENTRY SYLLABUS | View |
| 1008 | WS-117L SITE UTILIZATION COOKE AFB AND ELSEWHERE | View |
| 1009 | WS-117L VEHICLE HEIGHT ON LAUNCH STAND | View |
| 1010 | WS-117L WORK STATEMENT AIR FORCE BALLISTIC MISSILE (AFBM) EXHIBIT 58-25, 10 DECEMBER 1958, PART B | View |