FULCRUM: Case Study and Competition for HEXAGON: FULCRUM Documents
-
- IMPORTANCE OF PROCEEDING TO MEET THE REQUIREMENT OF DEVELOPMENT OF A NEW SATELLITE RECONNAISSANCE SYSTEM
- ITEK DISCUSSIONS WITH DR. MCMILLAN AND MR. LAND
- FULCRUM CAMERA SYSTEM TEST PLAN
- MEMO FOR DEPUTY DIRECTOR OF CENTRAL INTELLIGENCE RE PROJECT FULCRUM
- RECAPITULATION OF AND COMMENT ON DISCUSSIONS OF NEW SYSTEMS
- STATUS OF FULCRUM CAMERA SYSTEM
- REVISED WORK STATEMENT AND SCHEDULE OF DELIVERABLE ITEMS AS CONTAINED IN PROPOSAL 9204-SHC64-141
- MEMO FOR DDS&T/CIA FROM BROCKWAY MCMILLAN RE DESIGN OF FULCRUM CAMERA
- MEMO FOR DR. WHEELON FROM JOHN MCMAHON RE ITEK EFFORT ON FULCRUM
- LETTER TO BROCKWAY MCMILLAN FROM ALBERT D. WHEELON RE FULCRUM
- REFRACTIVE PANORAMIC CAMERAS AS CANDIDATES FOR THE NEW SEARCH SYSTEM
- CONDUCT OF THE FULCRUM PROGRAM
- KEY EVENTS IN THE CHRONOLOGY OF THE FULCRUM/HEXAGON PROGRAM WITH ITEK CORPORATION
- OUTLINE OF THE STUDY EFFORTS UNDERTAKEN THAT APPLY TO OR ARE RELATED TO GENERAL SEARCH AND SURVEILLA
- KEY MILESTONES IN FULCRUM/HEXAGON PROGRAM
- FULCRUM SYSTEM SUMMARY
- FUNDING FOR PHASE II OF KWFULCRUM
- CHRONOLOGY OF FULCRUM EFFORT WITH ITEK
- STRATEGIC AIR COMMAND BRIEFING ON SATELLITE WAR RECONNAISSANCE
- CONTRACT APPROVAL TO ACCEPT OVERRUN ON CONTRACT MB-1957 NOT TO EXCEED SEVENTY-FIVE THOUSAND DOLLARS
- MEMO FOR DIRECTOR OF CENTRAL INTELLIGENCE; KEY EVENTS IN THE CHRONOLOGY OF THE FULCRUM/HEXAGON PROGRAM WITH ITEK CORPORATION
- REPORT FROM THE FEBRUARY 24TH PANEL ON THE FULCRUM DEVICE
- KEY BACKGROUND MILESTONES IN FULCRUM/HEX PROGRAM
- DEPT OF AIR FORCE MEMO: SUMMARY OF CAMERA SYSTEM STUDIED BY PERKIN-ELMER AS BACK UP TO ITEK ON FULCRUM
- TWX RE STATUS OF FULCRUM CAMERA SYSTEM
- MEMO FOR THE RECORD FROM BROCKWAY MCMILLAN RE DETERMINATION ABOUT INCORPORATING TECHNICAL DIRECTION LANGUAGE INTO THE FULCRUM SYSTEMS ENGINEERING CONTRACT
- PROPOSAL FOR 6 MONTH FEASIBILITY STUDY FOR PHASE I OF FULCRUM
- BACKGROUND AND STATUS OF A NEW SATELLITE SYSTEM FOR GENERAL SEARCH
- NRO CONTRACTOR'S STUDY EFFORTS EXCLUSIVE TO FULCRUM THAT ARE RELATED TO GENERAL SEARCH AND SURVEILL
- TASK STATEMENT FULCRUM CORONA DISCHARGE ANALYSIS
- CIA MANAGEMENT OF SATELLITE PROJECTS
- LETTER FROM GEN CARTER TO BROCKWAY MCMILLAN REGARDING A COPY OF TECHNICAL DATA ON FULCRUM
- MAIN CAMERA INTERFACE SPECIFICATION (9204-SHC64-191)
- FUNDING FOR PROJECT FULCRUM
- MEMO FOR THE RECORD FROM BROCKWAY MCMILLAN RE AGREEMENT TO BRIEF DR. FUBINI, GENERAL STEWART ON FULCRUM
- TELEPHONE CONVERSATIONS WITH REPRESENTATIVES OF THE ITEK CORPORATION
- LETTER TO BROCKWAY MCMILLAN FROM WILLIAM F. RABORN JR. RE SUSTAINING CONTRACTS ON THE FULCRUM SYSTEM & HAVE UNDERTAKEN A RE-EVALUATION OF BASIC ITEK DESIGN
- ITEK - FULCRUM CAMERA PROGRESS
- LETTER FROM BROCKWAY MCMILLAN D/NRO TO DR. ALBERT D. WHEELON RE BRIEFING ON FULCRUM
- 2 MEMOS; 1. MEMO FOR CYRUS VANCE FROM JOHN MCCONE RE FULCRUM PROJECT. 2. MEMO FOR DCI FROM ALBERT WHEELON RE CONDUCT OF THE FULCRUM PROJECT
- RECORD OF EVENTS AT ITEK MEETING REGARDING THE DECISION ON THE FULCRUM MATTER
- RECOMMENDATION TO SIGN MEMO TO MCCONE
- COPIES OF AMENDMENT NO. 1 TO CONTRACT MB-1957
- SELECTION OF A NEW RECONNAISSANCE SYSTEM
- MEMO FOR DR. WHEELON FROM JOHN MCCONE RE FULCRUM
- BROAD COVERAGE SYSTEM
- SUMMARIZATION OF THE SIGNIFICANT INSTRUCTIONS AND ARRANGEMENTS CONCERNING THE WRAP-UP OF CONTRACT MB
- LETTER TO CYRUS VANCE FROM JOHN MCCONE RE: THE DEVELOPMENT OF A NEW RECONNAISSANCE SYSTEM
- MEETING OF 26 JUNE WITH MR. MCCONE, GENERAL CARTER, DR. FUBINI, AND DR. WHEELON
- MEMO FOR CYRUS VANCE FROM MARSHALL S. CARTER RE FULCRUM
- STUDY FOR SEARCH SATELLITE SYSTEM - PROJECT KWFULCRUM
- MEMO FOR SECRETARY VANCE FROM BROCKWAY MCMILLAN RE FULCRUM
- CONDUCT OF FURTHER STUDIES OF FULCRUM
- LETTER TO JOHN MCCONE FROM CYRUS VANCE RE FULCRUM
- KEY MILESTONES IN FULCRUM/HEXAGON PROGRAM
- FULCRUM PROGRAM HISTORY
- MONTHLY COST STATUS CHART ON FULCRUM CONTRACT MB-1957
- BRIEFING OUTLINES FOR PSAC PANEL BRIEFING
- COST, SCHEDULE & MANPOWER PROPOSAL F SYSTEM PROGRAM
- TECHNICAL ADVICE ON THE RESULTS OF A REVIEW OF THE FULCRUM CAMERA IN RELATION TO THE SELECTION OF A NEW SEARCH SYSTEM
- CAMERA ACCEPTANCE TESTING
- PROPOSAL FOR INITIATING PRELIMINARY DESIGN AND ENGINEERING FOR FULCRUM
- FULCRUM INVESTIGATION AT THE ITEK CORPORATION
- MEMO FOR THE RECORD; CONVERSATION BETWEEN MR. MAXEY AND MR. FRANK MADDEN OF ITEK CORPORATION VIS-A-VIS THE FULCRUM PROGRAM CANCELLATION
- PROPOSED FURTHER FUNDING OF FULCRUM
- LETTER TO CYRUS VANCE FROM MARSHAL S. CARTER RE FULCRUM PROGRAM FUNCTION OF AN SE CONTRACTOR
- ITEK - FULCRUM CAMERA PROGRESS
- LETTER FULCRUM, EXECUTED COPIES OF AMENDMENT NUMBER 1 TO CONTRACT MB-1957
- STUDY FOR SEARCH SATELLITE SYSTEM - PROJECT KWFULCRUM
- SUMMARY OF CHARACTERISTICS OF CAMERA SYSTEM STUDIED BY PERKIN-ELMER AS A BACKUP TO ITEK ON FULCRUM
- MEETING WITH SECRETARY MCMILLAN 22 JANUARY 1965 REGARDING FULCRUM
- MEMO FOR DEPUTY DIRECTOR FOR SCIENCE AND TECHNOLOGY RE STUDY TO IDENTIFY THE PHYSICAL CAPABILITIES OF VARIOUS SENSORS FOR A SEARCH SATELLITE SYSTEM - PROJECT FULCRUM
- MEMO FOR DR. MCMILLAN REGARDING FUNDING OF FULCRUM ACTIVITIES FOR THE MONTH OF MAY 1965
- MEMO FOR DDS&T FROM MARSHALL S. CARTER RE CONDUCT OF THE FULCRUM PROGRAM
- ITEK FULCRUM CASE
- LETTER TO CYRUS VANCE FROM F. RABORN RE SPECIAL TECHNICAL ADVICE ON THE RESULTS OF REVIEW OF THE FULCRUM CAMERA IN RELATION WITH THE SELECTION OF A NEW GENERAL SEARCH SYSTEM AS A FOLLOW-ON TO CORONA
- MEMO FOR THE DEPUTY SECRETARY OF DEFENSE: PROPOSED FURTHER FUNDING OF FULCRUM
- COMPLETION OF FEASIBILITY PROGRAM OBJECTIVES FOR THE FULCRUM PROGRAM
- REQUEST FOR RETAINING ONE SET OF FULCRUM PROJECT DOCUMENTATION IS DENIED FOR SECURITY REASONS
- MEMO FOR THE RECORD; BRIEFING OF CONTRACTORS REGARDING COMPETITIONS IN PROJECT FULCRUM
- PROPOSED FURTHER FUNDING OF FULCRUM
- MEMO FOR DIRECTOR NRO FROM MARSHALL CARTER RE INITIAL CIA REPRESENTATIVE TO STEERING GROUP AND BRIEFING FULCRUM
- MEMO FOR DEPUTY DIRECTOR FOR SCIENCE AND TECHNOLOGY; CHRONOLOGY OF FULCRUM EFFORT WITH ITEK
- ADDENDUM TO "PROPOSAL FOR FULCRUM CAMERA SYSTEM FEASIBILITY STUDY"
- MEMO FOR THE DEPUTY SECRETARY OF DEFENSE FROM BROCKWAY MCMILLAN RE PROPOSED FURTHER FUNDING OF FULCRUM
- REPORT ON FULCRUM HISTORY
- EUGENE FUBINI'S THOUGHTS ON A STUDY FOR IMPROVEMENTS TO THE CORONA SYSTEM
- LETTER TO BROCKWAY MCMILLAN FROM ALBERT D. WHEELON RE FULCRUM PROGRAM
- FULCRUM FUNDING
- MEMO FOR THE RECORD; PRESENTATION OF FULCRUM TO THE LAND PANEL
- CONSOLIDATION OF ALL SATELLITE ACTIVITIES FOR THE CIA ORGANIZATIONAL STRUCTURE
- MEMO FOR DIRECTOR OF CENTRAL INTELLIGENCE RE FULCRUM PROGRAM AND FUNDING REQUIREMENTS
- MEMO FOR DIRECTOR OF CENTRAL INTELLIGENCE RE ITEK ACTIVITIES ON PROJECT FULCRUM
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 28 ON PROJECT FULCRUM
- MEMO FOR THE RECORD; MEETING WITH PERKIN-ELMER ON 22 MARCH 1965 RE THEIR ASSESSMENT OF THE FULCRUM ITEK DESIGN
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 21 ON PROJECT FULCRUM
- PROPOSAL FOR FULCRUM CAMERA SYSTEM FEASIBILITY STUDY
- MEMO FOR FILE; FULCRUM BRIEFING TO DR. MCMILLAN ON 4 DECEMBER
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 29 ON PROJECT FULCRUM
- ITEK ACTIVITIES ON PROJECT FULCRUM
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 26 ON PROJECT FULCRUM
- MR. MCNAMARA IS REQUESTED TO AFFORD THE ACORN COMMO OPERATOR A FULCRUM PHASE 3 BRIEFING
- PROJECT FULCRUM
- ADDENDUM TO PROGRAM B'S FISCAL YEAR 1965 BUDGET
- FUNDING APPROVAL FOR MARCH 1966, <SANITIZED> AND FULCRUM PROGRAMS
- DD-250 FORM COVERING THE SHIPMENT OF THE MAIN CAMERA PRELIMINARY INTERFACE SPECIFICATION UNDER CONTR
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 27 ON PROJECT FULCRUM
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 20 ON PROJECT FULCRUM
- MEMO FOR THE RECORD; MEETING AT EASTMAN KODAK RE FULCRUM PROGRAM
- WEEKLY STATUS REPORT NO. 21 ON PROJECT FULCRUM
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 19 ON PROJECT FULCRUM
- AGENDA FOR THE PERIODIC FULCRUM PROGRAM REVIEW SCHEDULED FOR 11 JANUARY
- PROJECT FULCRUM OVERVIEW
- WEEKLY STATUS REPORT NO. 25 ON PROJECT FULCRUM
- COPIES OF FORM DD-250 COVERING THE SHIPMENT OF THE INTERFACE SPECIFICATION (9204-SHC64-105) FOR FULCRUM
- REQUEST FROM BROCKWAY MCMILLAN TO GEN. CARTER FOR COPIES OF FULCRUM CHARTS USED IN THE LAND PANEL
- MEMO FOR THE RECORD; FULCRUM STATUS BRIEFING 18 JANUARY 1965
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 4 ON PROJECT FULCRUM
- ITEK CORPORATION CONTRACT NO. MB-1957
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 9 ON PROJECT FULCRUM
- MEMO FOR CHIEF, SPECIAL PROJECTS STAFF; WEEKLY STATUS REPORT NO.2 ON PROJECT FULCRUM
- LETTER TO BROCKWAY MCMILLAN FROM ALBERT D. WHEELON RE FULCRUM
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 24 ON PROJECT FULCRUM
- AMENDMENT NO. 2 TO CONTRACT NO. MB-1956
- MEMO FOR DNRO FROM JOHN M. CLARK RE FUNDING FOR PROJECT FULCRUM
- MEETING NOTES REGARDING PROJECT KWFULCRUM 19 FEBRUARY 1964
- WEEKLY STATUS REPORT NO. 16 ON PROJECT FULCRUM
- CONTRACT NO. MB-1957 IS BEING WRITTEN TO EVIDENCE THE NEGOTIATION HELD 12/22/64
- NRO STAFF VISIT TO ITEK
- COVER MEMO AND REPORT ON CURRENT STATUS OF PROJECT FULCRUM
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 15 ON PROJECT FULCRUM
- EXTENSION OF FULCRUM FUNDING FOR MONTH OF FEBRUARY 1965
- WEEKLY STATUS REPORT NO. 18 ON PROJECT FULCRUM
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 14 ON PROJECT FULCRUM
- WEEKLY STATUS REPORT NO. 27 ON PROJECT FULCRUM
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 23 ON PROJECT FULCRUM
- MEETING WITH GENERAL STEWART RE FOLLOW-ON SEARCH SYSTEM
- WEEKLY STATUS REPORT NO. 23 ON PROJECT FULCRUM
- PRECONTRACT APPROVAL RECORD FOR ITEK CORPORATION, CONTRACT MB-1956 AMENDMENT 2
- FUNDING FOR PROJECT FULCRUM
- PAYMENT PLAN FOR ITEK CORPORATION
- FULCRUM LETTER AND REPORT; MAIN CAMERA PRELIMINARY INTERFACE SPECIFICATION
- WORK STATEMENT FOR CONTRACT NO. MB-1957
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 16 ON PROJECT FULCRUM
- MEMO FOR CHIEF, SPECIAL PROJECTS STAFF; WEEKLY STATUS REPORT NO.1 ON PROJECT FULCRUM
- ITEK CORPORATION HAS WITHDRAWN FROM THE FULCRUM PROGRAM
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 11 ON PROJECT FULCRUM
- PRECONTRACT APPROVAL RECORD FOR ITEK CORPORATION, CONTRACT MB-1956
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 13 ON PROJECT FULCRUM
- FUND STATUS REPORT FOR DIRECTOR B PROGRAM - 30 APRIL 1965
- PRESENTATION OF FULCRUM TO THE LAND PANEL
- PAYMENT PLAN FOR ITEK CORPORATION
- REVIEW OF FY 1965 NRP
- NEW GENERAL SEARCH AND SURVEILLANCE SYSTEM
- FUNDING FOR PROJECT FULCRUM
- FUNDING APPROVAL FOR MARCH 1966, <SANITIZED> AND FULCRUM PROGRAMS
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 25 ON PROJECT FULCRUM
- REQUEST FROM BROCKWAY MCMILLAN TO GEN. CARTER FOR COPIES OF FULCRUM CHARTS USED IN THE LAND PANEL ON
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 5 ON PROJECT FULCRUM
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 7 ON PROJECT FULCRUM
- WEEKLY STATUS REPORT NO. 15 ON PROJECT FULCRUM
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 22 ON PROJECT FULCRUM
- WEEKLY STATUS REPORT NO. 26 ON PROJECT FULCRUM
- WEEKLY STATUS REPORT NO. 13 ON PROJECT FULCRUM
- FULCRUM WORK STATEMENTS
- PRECONTRACT APPROVAL RECORD FOR ITEK CORPORATION, CONTRACT MB-1956 AMENDMENT 1
- MEETING AT EASTMAN KODAK TO BROKER TWO PROBLEMS WHICH THE ITEK CORPORATION HAD COME UPON IN THE FULCRUM PROGRAM
- WEEKLY STATUS REPORT NO. 17 ON PROJECT FULCRUM
- CIA/NRO FISCAL YEAR 1966 BUDGET
- FULCRUM CONTRACT MB-1957 EXTENTION
- MEETING WITH ITEK REPRESENTATIVES IN HEADQUARTERS ON 2 MARCH 1965
- SECURITY CLASSIFICATION OF THE NATIONAL RECONNAISSANCE PROGRAM
- PRECONTRACT APPROVAL RECORD FOR ITEK CORPORATION, CONTRACT MB-1957 LETTER CONTRACT
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 18 ON PROJECT FULCRUM
- AMENDMENT NO. 1 TO CONTRACT NO. MB-1957
- WEEKLY STATUS REPORT NO. 19 ON PROJECT FULCRUM
- WEEKLY STATUS REPORT NO. 14 ON PROJECT FULCRUM
- AMENDMENT NO. 1 TO CONTRACT NO. MB-1956
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 12 ON PROJECT FULCRUM
- WEEKLY STATUS REPORT NO. 24 ON PROJECT FULCRUM
- LONG RANGE FUNDING FOR FISCAL YEARS 1967-1970
- THE BASIC AUTHORIZATION FOR DISCLOSURE OF FULCRUM INFORMATION
- MEMO FOR THE RECORD; AUTHORITY TO SPEND APPROXIMATELY AN ADDITIONAL $400,000 IN THE PERKIN-ELMER FULCRUM EFFORT
- FUNDING APPROVAL FOR APRIL 1966, <SANITIZED> AND FULCRUM PROGRAMS
- FULCRUM CONTRACT (MB-1957) WITH ITEK CORPORATION
- PROBLEMS POSED BY THE CIA REQUEST FOR FUNDS FOR THE NRO PROGRAM
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 8 ON PROJECT FULCRUM
- TWX RE ITEK CORPORATION HAS WITHDRAWN FROM THE FULCRUM PROGRAM
- FULCRUM STATUS MEETING AT THE BURLINGTON FACILITY, ITEK CORPORATION
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 17 ON PROJECT FULCRUM
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 3 ON PROJECT FULCRUM
- WEEKLY STATUS REPORT NO. 29 ON PROJECT FULCRUM
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 10 ON PROJECT FULCRUM
- WEEKLY STATUS REPORT NO. 22 ON PROJECT FULCRUM
- MEMO FOR CHIEF OF PROJECTS; WEEKLY STATUS REPORT NO. 6 ON PROJECT FULCRUM
- WEEKLY STATUS REPORT NO. 20 ON PROJECT FULCRUM
- APPROVAL TO EXTEND APPROXIMATELY 1600 HOURS OF OVERTIME ON THE "F" PROGRAM CONTRACT
- WEEKLY STATUS REPORT NO. 28 ON PROJECT FULCRUM